Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Gelco Construction Co. <br />P.O. Box 7716 <br />Salem, Oregon 97303 <br />Date: November 17, 2010 <br />From: Michael E. Wilson <br />Project: 2009 WASTEWATER REHABILITATION PIPE REPLACEMENT <br />BASINS - DC31,DC32,DW14,DW15 <br />Contract Number: 2010 - 04 <br />Job Number: 4638 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />Engineer: <br />Address: <br />Owner. <br />Address: <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />ROJ-8\4638 2009 Wastewater Rehab <br />arranty Period.doc <br />01117MEWFinal <br />J <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager , Revised 4104 <br />