New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4638 Final Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2011
>
GJN4638 Final Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:34:35 PM
Creation date
11/19/2010 11:11:52 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004638
GL_Project_Number
995305
COE_Contract_Number
2010-00004
Retention_Destruction_Date
11/17/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Gelco Construction Co. <br />P.O. Box 7716 <br />Salem, Oregon 97303 <br />Date: November 17, 2010 <br />From: Michael E. Wilson <br />Project: 2009 WASTEWATER REHABILITATION PIPE REPLACEMENT <br />BASINS - DC31,DC32,DW14,DW15 <br />Contract Number: 2010 - 04 <br />Job Number: 4638 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />Engineer: <br />Address: <br />Owner. <br />Address: <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />ROJ-8\4638 2009 Wastewater Rehab <br />arranty Period.doc <br />01117MEWFinal <br />J <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager , Revised 4104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.