New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4528 Begin Warranty (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4528 Begin Warranty (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 10:41:24 AM
Creation date
6/3/2010 11:29:08 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004528
GL_Project_Number
985334
COE_Contract_Number
2009-00026
Retention_Destruction_Date
8/5/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Completion Dates for Contract Projects <br />~%Jv Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541)682-5291 <br />DATE <br />CONTRACT NO. <br />8/5/2009 <br />2009-26 <br />PROJECT NAME <br />JOB NO. <br />PPP 2009 Seneca St. <br />4528 <br />CONTRACTOR <br />FEDERAL AID PROJECT NO. <br />Wildish Construction <br />INSPECTOR <br />PHONE NUMBER <br />DATE OF AWARD <br />Mike Koivula <br />682-5396 <br />6/15/09 <br />FIRST NOTIFICATION <br />8/5/09 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />10/2/09 0 0 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: April 16, 2010 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />April 16, 2010 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK <br />EQUIPMENT AND <br />, <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS <br />BILLS AND OTHER DOCUMENTS <br />, <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 <br />#4 <br />and #5 <br />ALL WORK IS <br />, <br />, <br />, <br />GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. <br />MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF <br />GREATER THAN <br />, <br />THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN <br />WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR <br />WARRANTY PERIOD WILL BE REQUIRED TO BE GUARANTEED. FOR ONE YEAR FROM DATE OF ACCEPTANQE <br />OF THE REPAIR. t Q~ <br />a <br />s <br />, <br />, <br />t'ns <br />pe~~orSig <br />nature <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Ginger Perales, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />POS Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Q:\PROJECTS\PROJ-8\4528\Correspondence\Contractors\4528 20100524 3rd Notification.doc March 2009 <br />AK <br />1 <br />=mot` <br />
The URL can be used to link to this page
Your browser does not support the video tag.