New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4586 PBS Post bid
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4586 PBS Post bid
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:35:47 AM
Creation date
5/10/2010 11:23:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004586
GL_Project_Number
995384
Retention_Destruction_Date
8/11/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT BUDGET SUMMARY <br />PBM Harlow Rd from 1-d to Cobura Rd <br />JN 4586 <br />ORIGINAL <br />p <br />,s f1 <br /> <br />(circle one) <br />PRE-DESIGN <br />l.~ <br />~JO 7 <br />REVISED <br />CURRENT FUNDING STATUS <br />PRE-BID <br />PO$T 81D <br />FINAL <br />Original Budget allocated to this project - - - - <br />- - - - - <br />- - - - - - <br />$10,000.00 <br />ACCOUNT <br />FUND <br />Assessments <br />$0 00 <br />Road <br />$0 00 <br />Sanitary Sew. <br />$0 00 <br />Storm Sew. <br />$0 00 <br />Subsidy <br />$0 00 <br />975014 <br />Fund 133 <br />$10,000 00 <br />Other <br />$0 00 <br />Other <br />$0 00 <br />ESTIMATED CONSTRUCTION COSTS <br />Contractor(s): <br />Knife River Corp <br />oration-Northwest <br />Contract Amount - - - - <br />- - - - - <br />- - - - - - - - <br />$775,077.50 <br />Contingency 10 0% <br />$77,507.75 <br />Total Estimated Costs - - - <br />- - - - - <br />- - - - - - - <br />$852,585.25 <br />ESTIMATED ENGINEERING COSTS <br />Engineering Expenses to Date (PSF) - - - - - - - - - - - - - $73,000 00 <br />Estimated Engineering Expenses to Completion- - - - - - - - - - $86,986 19 <br />Total Estimated Engineering Costs - - - - - - - - - - - - - - - - $159,986.19 <br />ESTIMATED ADMINISTRATION/SHORT TERM FINANCING <br />(use numbers from your assessment spreadsheet) <br />Admin. (5% of assessable) - - - - - - - <br />- - - - <br />- - - - - <br />$0 00 <br />Short Tenn Construction Financing - - - - - <br />- <br />$0 00 <br />Total Estimated Admin/Construction Financing- - - <br />- - - - <br />- - - - - <br />$0.00 <br />ESTIMATED DIRECT COSTS <br />BOLT PW Fee- - - - - - - - <br />y, <br />- - - <br />- - - - <br />- - - - - 0 18 <br />$775 08 <br />^D <br />Testing Expense Allocation - - - - - - - <br />- - - - <br />- - - - - 2% <br />$15,501 55 <br />l <br />Warranty Inspection Fee - - - (Fund Number <br /> <br />to charge to: <br />343 btreet Bond ) <br />$1,500 00 <br />~J <br />Permit Fees- - - - - - - - - - - <br />-l <br />- - - - <br />ack an dedtorarapcoim i~f <br />- - - - - - <br />$250 00 <br />Printing - - - - - - - - - - - - <br />- - - - <br />- - - - - <br />$250 00 <br />Advertising - - - - - - - - - - - - <br />- - - - <br />- - - <br />$500 00 <br />Total Estimated Direct Costs - - - - - - <br />- - - - <br />- - - - <br />$18,776.63 <br />ESTIMATED TOTAL EXPENSES <br />Estimated Contract Cost - - - - - - - <br />- - - - <br />- - - - - - <br />$852,585.25 <br />Estimated Engineering Costs - - - - - - <br />- - - - <br />- - - - - <br />$159,986.19 <br />Estimated Admin/Financ./Direct Costs - - - - - <br />- - - - <br />- - - - - - - - <br />$18,776.63 <br />Total Estimated Project Costs - - - - - - <br />- - - - <br />- - - - - - - <br />$1,031,348.07 <br />REVISED FUNDING STATUS <br />FUNDS TO <br />REMAINING <br />Short Term <br />THIS <br />FUND <br />ACCOUNT FUNDING SOURCE Constrict. Engineer. <br />Direct <br />Finance 5%Adm. <br />PROJECT <br />BALANCE <br />(click cells below for dropdown~ / <br />-IW'-8P5014343 Street, (Q( ~7 $824,820.25 $159,986.19 <br />$18,776.63 <br />$0.00 <br />$1,003,583.07 <br />$0 00 <br />9021 3~ <br />10 <br />9 <br />85026 531 Stormwater Utility $13,200.00 $0.00 <br />lz(c <br />985015 <br />532 W <br />$0.00 <br />$0.00 <br />- $13,200.00 <br />$0 00 <br />. <br />astewater Utility tok <br />1 $3,900.00 $0.00 <br />k1~s ,0 $10 <br />975024 333 Trans <br />ortation SDC 1 <br />665 <br />00 $0 <br />00 <br />$0.00 <br />$0.00 <br />$3,900.00 <br />$0 00 <br />p <br /> <br />, <br />. <br />. <br />5415' $0 00 $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$10,665.00 <br />$0.00 <br />s0 00 <br />$0 00 <br />\v <br />Other. Overwrite cell to enter fund and fund number $0 00 $0.00 <br />$0.00 <br />$0.00 <br />$0,00 <br />Other. Ove-rite cell to enter fund and fund number $0 00 $0.00 <br />$0.00 <br />$0.00 <br />$0,00 <br />TOTAL $852,585.25 $159,986.19 <br />$18,776.63 <br />$0.00 $0.00 <br />$1,031,348.07 <br />$0.00 <br />$1,031,348.07 <br />BUDGET RECOMMENDATION <br />This is a Bond measure funded project that citizens voted to have constructed. I recommend moving forward and funding the construction. <br />9 <br />this project be allocated as shown above <br />Project a g D e Date <br />Administration Date <br />1021348.068 <br />s". <br />Date <br />5/5/2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.