Public Works <br />Engineering and Construction Agreement U6 Engineering <br />Job.# Contract -9 . Capital Project # s~ -9 :.,r06alvft Suite 400 <br />~u x e, br4e on 97401 <br />(541) 682-5032 FAX <br />The undersigned Owner requests the Public Improvements as described below: <br />Type of Improvement: 684r U'li I1 1,061 wV +Cemck rJer-Sur_FaUd <br />ving, wastewater, stotmwater, street lights) <br />Location: e ls+reG+ <br />(Street or easement if a subdivision, print subdivision name) <br />North or east limit: S+res_'f South or west limit: <br />(Except for subdivisions) (Except for subdivisions) <br />be designed and constructed during the .1016 or subsequent construction season in the following manner (check one): <br />(Year) <br />❑ 1. As a City engineered and constructed project (eligible for assessment financing). <br />City agrees: <br />a) to perform engineering design, cost estimate, award of contract, construction inspection, and assessment tabulation for the <br />improvements; <br />b) to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts as stipulated in <br />the Eugene Municipal Code. <br />Owner agrees: <br />a) to pay all engineering and construction costs which are not eligible for assessment financing. <br />b) if the undersigned owner chooses to discontinue the City engineering and construction process prior to execution of a <br />construction contract, the owner further agrees to pay all engineering and other project-related costs incurred by the City to <br />that point, and to comply with paragraph 2 below, if applicable. <br />2. As a privately engineered and constructed project with private financing arranged by the Owner. <br />Owner agrees: <br />a) to install all required public improvements at no cost to the City; <br />b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other engineering <br />services, all of which will be billed and payable monthly with final payment due prior to City's final acceptance of the <br />completed improvements. <br />c) to provide the City a bond, which includes a one-year warranty period, in an amount sufficient to cover all engineering and <br />construction costs associated with completion of the required public improvements. <br />d) to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br />1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br />owner shall be charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is <br />greater. Payment of the penalty shall not constitute a waiver by the City of its other remedies. <br />2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) per <br />annum from the due date until paid. This sum shall be in addition to penalty charges. <br />PROPEtT~ 'OWikIF1 C~ <br />-Q N Q(T.VOF EIiGEN <br />oar ;l A"ice C u 0~ o <br />PROPERTY OWNER'S NAME <br />q1-7 <br />DATE <br />(x36 1xiver'KA, -of Ore, 11 <br />ADDRESS <br />aof,ne. 02 rt7g0 -1a76 <br />C~STATLT/ ZIP <br />CO-OWNER'S SIGNATURE <br />CO-OWNER'S NAME <br />DATE <br />TITLE <br />.o -ro <br />DATE <br />ADDRESS <br />CITY / STATE <br />101 E BROADWAY, SUITE 400 <br />EUGENE OREGON 97401 <br />Orrgtnal to the ;City of E4gone <br />lyopies to Owner Co owner and Ihspec#Pr ' <br />PHONE NUMBER (business hours) PHONE NUMBER (business hours) <br />