Final Acceptance Public Works <br />Completion of Warranty Period Engineering <br />99 East Broadway, Ste 400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />(541) 682-8410 <br />To: Delta Construction <br />999 Division Avenue <br />Eugene, OR 97404 <br />Project: North Game Farm Road <br />Contract Number: 2009-00006 <br />Date: March 18, 2010 <br />From: Lisa Jeffryes <br />Job Number: 4376 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings.* <br />No defects were noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />*Exception to final acceptance are products installed under Special Provisions #850.75 and #862.75 <br />due to longer warranty periods. <br />--FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer: <br />Address: <br />Owner. <br />Address: <br />Q:\PROJECTS\PROJ-6\4376\Correspondence\Contractors\4376-20100318Fina1 Acceptance Completion of Warranty Period.doc ink <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4104 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects nQ <br />