New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4610 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2010
>
GJN4610 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:14:59 PM
Creation date
1/8/2010 10:26:09 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004610
GL_Project_Number
995464
Identification_Number
2010-00001
COE_Contract_Number
2010-00001
Retention_Destruction_Date
3/23/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />99 E. Broadway, #400 <br />Eugene, OR 97401 <br />(541) 682-5291 <br />DATE ( CONTRACT NO. <br />8/18/2009 2010-01 <br />PROJECT NAME JOB NO. <br />2009 Paving Bond Measure - Goodpasture 4610 <br />CONTRACTOR FEDERAL AID PROJECT NO. <br />Knife River <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Dan KeDlev 541-682-5349 7/14/09 <br />FIRST NOTIFICATION <br />7/22/2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. <br />Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED <br />BEYOND SPECIFIED <br />COMPLETION <br />8/31/2009 <br />DATE (S) THE WORK WAS SUBSTANTIALLY <br />COMPLETED & THE TIME CHARGES STOPPED. <br />8/18/09 <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 9/10109 <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />11/23/2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br />CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br />REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN REQUIRED ONE YEAR. <br />THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN O HAT BECOME EVIDENT <br />WITHIN THE ONE YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR TY P~IOD WILL BE <br />REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. j <br />For Privately Engineered Projects Only <br />Engineer: <br />Address: <br />Owner: <br />Address: <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Ginger Perales, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />POS Maintenance-Planning Surety PW;Administration ` PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />Q:\PROJECTS\PROJ-0\461 0\Correspondence\Contractors\4610 Third Notification.docx March 2009 nR <br />
The URL can be used to link to this page
Your browser does not support the video tag.