New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Bailey Hill Bike Ped grant e-mail
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
Bailey Hill Bike Ped grant e-mail
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2011 9:41:56 AM
Creation date
10/5/2009 1:30:28 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Correspondence
PW_Active
No
External_View
No
GJN
004585
GL_Project_Number
995374
Retention_Destruction_Date
2/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SMITH Tammy D <br />From:MILOVICH Scott R <br />Sent:Monday, October 05, 2009 1:17 PM <br />To:SMITH Tammy D <br />Subject:FW: Bailey Hill Road ODOT Inspection <br />Tammy, <br />Here is some info from ODOT on the bike ped grant. <br /> <br />Scott <br /> <br />-----Original Message----- <br />From: ROTH David F <br />Sent: Monday, October 05, 2009 10:20 AM <br />To: MILOVICH Scott R <br />Cc: INERFELD Rob <br />Subject: FW: Bailey Hill Road ODOT Inspection <br /> <br />FYI <br /> <br />David Roth <br />Associate Transportation Planner <br />City of Eugene <br />Public Works Engineering <br />99 E. Broadway, Suite 400 <br />Eugene, OR 97401 <br />T: 541.682.5727 <br />F: 541.682.5598 <br /> <br />www.eugene-or.gov/transportation <br /> <br /> <br />-----Original Message----- <br />From: GUTIERREZ Rodger C [mailto:Rodger.C.GUTIERREZ@odot.state.or.us] <br />Sent: Monday, October 05, 2009 10:16 AM <br />To: ROTH David F <br />Cc: LYONS Sheila A <br />Subject: RE: Bailey Hill Road ODOT Inspection <br /> <br />David, <br /> <br />We conduct a walk-through inspection after projects are complete to verify that it was built <br />according to the grant application and to the approved construction plans and to also verify <br />that facilities meet ADA standards. If there is any issue, we will require that the issue is <br />fixed before making final payment. If there is a ribbon-cutting event, we will usually <br />inspect the project at that time. Sheila Lyons attended the ribbon-cutting ceremony for this <br />project and I only heard positive feedback of the project, so I don't believe there were any <br />issues with the Bailey Hill portion of the project. <br /> <br />This grant has 2 parts: Bailey Hill improvements and flashing beacons on River Road. I <br />haven't seen plans for the flashing beacons on River Road yet. When they are designed and <br />constructed, we will schedule an inspection and make final payment following that. <br /> <br />Thank you, <br />1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.