CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS ' <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: Babb Construction Co. dba Delta Construction Co. <br />(ADDRESS) 999 Division Avenue <br />Eugene OR 87404 <br />PROJECT: Crest Nel boyhood street Im rovement Pro ed <br />You are directed to matte the following changes in this contract <br />Job # <br />.4546 <br />Contract # <br />2009.030 <br />Chan Order# <br />1 <br />Date: <br />} / -} <br />CAMS Date; <br />Net <br />Change <br />Reviewed by. <br />Date: <br />Inspector; <br />T. Fahsbendar <br />Praj. Mgr. <br />J. Willer <br />Principal Eng. <br />P. Klo <br />Item <br />No. <br />Item <br />Time <br />Change <br />Quantity <br />Units <br />Unit <br />Cost <br />Amount <br />} / -} <br />Amended <br />Change <br />Net <br />Change <br />243 <br />Replace Wadavater Service {Force Account? <br />ar' 1nai <br />0.00 <br />to= <br />0.00 <br />$2,1,26,407.20 <br />$1 <br />$0.00 <br />Revisal <br />0.00 <br />$0.00 <br />$p.00 <br />This change order wiil change contract sum b this amount , , - _ - � <br />Amended <br />1.00 LS <br />$1,0D821 <br />. f 008.21 <br />$.13;732.41 <br />242 <br />Catch Basin with Bike Proof Grate <br />Percentage of original contract <br />- <br />Orig inal <br />0.00 <br />,OD <br />$0.00 <br />$3,296.70 <br />$0.00 <br />-Revised <br />0.00 <br />.00. <br />10.00 <br />[ Date <br />O <br />Amended <br />2.00 EACH <br />11,64835 <br />$3,296.70 <br />243 <br />Adjust Existirig Catch Basin <br />o ]nal <br />0.00 <br />$0.00 <br />$0.00 <br />$990.00 <br />$0,00 <br />Revised <br />0.00 <br />0.00 <br />.00 <br />Amended <br />1.00 EACH <br />$990.00 <br />$990.00 <br />301 <br />Small, Irregular Pavement. Replacement <br />Fast: of Uncoln <br />orig inal <br />0.00 <br />jL00 <br />12.00 <br />$3,437 <br />$0.00 <br />Revised <br />0.00 <br />$0.00 <br />$O.OD <br />Amended <br />25.00 TONS <br />137.50 <br />$3 , 437.50 <br />Original <br />0.00 <br />.00 <br />$0.00 <br />0.00 <br />$0.00 <br />Revlsed <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />0.00 <br />$0.00 <br />0.00 <br />Or[ Inal <br />0.00 <br />0.00 <br />0.00 <br />$0.00 <br />$0.00 <br />Revised <br />0.00 <br />0.00 <br />0.00 <br />Amended <br />0.0 <br />-- a- 00 . 1 <br />This changes the bid items as follows: <br />The original contract wort days are 0.0 da <br />The contract time change this C.O OA d <br />The contract time change by previous C.C.'s 0.0 da <br />The new contract work d= are 0.0 d a y s <br />The original contract sum was _. <br />$2,1,26,407.20 <br />�.._. '�, <br />Net change by previous change order <br />$0.00 <br />Net change due to amendment by previous change order _ <br />$0 ,D0 <br />The contract sum prior to this change order was _�.� <br />$2 .120 ,407.20 <br />This change order wiil change contract sum b this amount , , - _ - � <br />$ 7s2A1� <br />_ <br />The new contract net change sure ...�...�.�... ...�.. <br />0.00 <br />The new contract amendment sum _ � .. .� M. <br />$.13;732.41 <br />The new contract sum including this change order wiif be W - <br />Percentage of original contract <br />- <br />0.41% <br />NET CHANGIr DUE TO AMENDMENTS <br />- 0.41% 1 <br />Approv y; <br />City gineer Prime Contra or Third Party <br />f Date Date <br />[ Date <br />O <br />LJ CONTRACTOR OFFICE FILE PURCHASING1CRO <br />4:IPROJECT $V"OJ 5145461Construation%Chnnge Order3%4546 Change Order 7.x13 <br />This changes the bid items as follows: <br />