CITY OF EUGEN@ ~ . <br /> DS~ARTM~NT OF PUBLIC WORKS <br /> SNGINEI:RIN6 DIVISION <br /> Change Order lab # 4s14, 4s61 . _ <br /> Contract# 2oio-01 <br /> CONTRACTOR: Kn~ ttlyaf ~ Change Ordar# 1 <br /> (ADDRESS) iD41 Olvfslon Ava Da6a: 09119/09 ' <br /> Eugene, OR 87404 CAMS pate, <br /> Reviewed b . pate; <br /> - PROJECT: 2009 Pavement Bond Measure • on Raliraad tiled. from Van Buren St to nspector: D. K la <br /> Chambers SL Jab #4681 an Goo stun Island Itd. from Norkenzle Rd. D, Reuben <br /> to pelts Hi hwa Job #4810 Prof, Mgr. D. Sin er <br /> Prlndpal Eng. P, e <br /> -You era dlr~ted #a make the following changes in this contrail; ; <br /> Contract ' <br /> Item <br /> No. ' <br /> 624 LEVELS 112" DENSE HMAC: <br /> CONSTRUCT 7" OF HMAC IN TRAVEL ZANIES TAPERED FROM 7" TO b" STARTING S FROM THE CURB FROM APP#tOx1MATE STATION 36+OD 70 45+39.. <br /> 810 PAVEM REMOV 6": <br /> REMOVte FULL DEPTH PAVEMENT APPROXIMATELY FROM STATION 96+40 TO 48+38, <br /> 62D CURE ANp GUTTER REPLACEMENT; <br /> REMOVE AND REPLACE CURS ANp Gt1TTER A3 DIREGTEO APPROXIMATELY 35 <br /> 630 OVER-EXCAVATION <br /> Q(CAVATE EIISTING BASE ROCK AND SUBGRApE !N AREAS INDENTIFIED BY THE ENGO4EER TO A DEPTH DF 18" OR A5 DIRECTED. <br /> CONSTRUCT SUBGRADE GEOTEXTILE AND BASE AGGREGATE: TO TES GRADE OF THE EXISTING BASE MATERIAL <br /> Four 4 work da w01 be added for thh work to the Gaod asture island Raad ecl Work shalt be oom sled b Se tember 3 2DD9. <br /> This changes the bid hems as follows; <br /> GOntraCt GontraCt <br /> fife Tirile Quantity . Unit Amended Net <br /> Nfl. Item Chan a (Unite Cost Amount +l- Change Change <br /> 52D LEVEL 3,112", DENSE, HMAC (4610) 1 day O final i BD7.OD TON 54.44 0 350.00 #43,650.00 <br /> Re+Ased 680.OD TOH 5D,D4 134 44O.D0 <br /> Amended 0,00 .00 $0,00 . <br /> 610 PAVt3~tiBVT REMOVAL, 5° (4610) 1 day Orl lnal 0.00 0,64 .D4 $0,00 <br /> Revised 0,00 0.00 .04 <br /> Amended 31 OAD 5F ~D,78 ~2411~.00 4180.00 <br /> 620 CURS AHp GUTTER RE~EACE3~IENT (46i0) Inal 0,00 .00 .00 $0.00 <br /> Revised 11.46 6,00 .110 - <br /> ' Amended 35.W LF D,DD 100.00 ;700.00 <br /> 630 QVER•El(CAVATION (4fi10) Z days Inal 4,00 4.OD O,DO $0.00 <br /> RevLsed a.~ D,4D 4.oa <br /> <br /> ` Amended 704,00 CUYp 54,85 38,395.00 $38,395.D0 <br /> Enal D.00 J1D 0.04 $0.00 <br /> Revised D.00 AO 0,40. <br /> Amended D.04 .OD ;0.04 #O.DO <br /> ' Ork final 0.00 .00 D,00 $O.OD <br /> Revised 0.40 .00 .00 <br /> Amended O.DO .00 4.40 #D.00 <br /> The originai contrail work days are zD,D ~ <br /> Tha contrail Mme cftange this C.0 4.o da <br /> The contrast Mme chmtge by previous C.O; <br /> s 4.0 da <br /> The new contract work da are 24,4 de <br /> The original contract stun was ~ Ssa3`4oa.34 <br /> Nat change by previous change order 64.40 <br /> Net change due to amendment by prevlcus change order aD.o4 <br /> The ct;ontract sum prior #o this Mange order was _ ~4a,ooa.~4 <br /> This change ardarwlll change contract surn by this amount s14s,s2s.ao <br /> The new contract net change sum ~ $4aSs64.4o <br /> The new contrail amendment-sum sBa,zrs.oo <br /> The new contrail sum induding this c~lange orderwlll be ,W„_ ssas,929.~4 <br /> Percents a of orl final Contract 18.69% <br /> CHANGE AUE 0 A ENDMEr~S ~ I~~~~ . 5o/a <br /> Approve! by: <br /> City Engineer Gontractar Third Parfy ' <br /> Date Aete Date <br /> D GONTRACTOR ~ OFFIGE FILE ~ Pt,RGHAStNGICRO <br /> QIFORMSIPROJECT4CONSTtREYISEpCHANGE OROt:R.Xl3 <br /> <br />