New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4643 Warranty begin
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4643 Warranty begin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 12:37:28 PM
Creation date
7/7/2009 8:55:44 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004643
GL_Project_Number
374643
Identification_Number
66993
COE_Contract_Number
2009-00507
Retention_Destruction_Date
6/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commelncement and <br /> Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E: Broadway, #400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> DATE CONTRACT NO. <br /> 7/2/2009 <br /> 2009-0507 <br /> PROJECT NAME JOB NO. <br /> Fred Meyer Improvements 4643 <br /> CONTRACTOR ~ FEDERAL AID PROJECT NO. <br /> Meng-Hannan Construction, 9301 SE Stanley Ave, Portland OR 97222 N/A ' <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Kris Olson 541 682-5249 N/A <br /> .FIRST NOTIFICATION <br /> 6/16/09 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN: Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED : COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> NIA N/A WA <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: NIA <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENT <br /> In pector Signature <br /> ~ Z U <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 7/2/09 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE.ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITYAMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN TH REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN KTH ME EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ON PERIOD• ILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR; <br /> l nspector Signature ~ p- <br /> For Privately Engineered Projects Only <br /> Engineer:. Barghausend Consulting <br /> Address:. 18215 72"d Ave South • <br /> Kent, WA 97202 <br /> Owner: James Loombes <br /> Address: 3800 SE 22nd Ave - <br /> Portland, OR 97242 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager _ File Ginger Perales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning ' Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:IPROJECTS\PROJ-3\4643 Fred Meyer Improvements\Correspondence\Contractors\4643-20090702 3rd Notification.doc March Zoos <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.