New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4574 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4574 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:26:13 AM
Creation date
6/22/2009 4:20:44 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004574
GL_Project_Number
374574
Retention_Destruction_Date
7/6/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notificatioln of Commencement and ~ Pubficworks <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 99 E. Broadway, #400 <br /> Eugene, OR 97401 <br /> (541) 682-5291 <br /> DATE CONTRACT NO: <br /> 6/18/2009 2009-504 <br /> PROJECT NAME JOB NO. <br /> U of O Basketball Arena-Villard Street WW & Stormwater improvements 4574 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> K & E N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Michael E. Wi?son 541 682-2748 ~ .12/25/2008 <br /> FIRST NOTIFICATION <br /> 1/12/2009 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE(S) (FROMSECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> t3EYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 3/1?J2009 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY:. April 7 2009 <br /> (SEE. SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> .Notice of Completion. Begin Warranty Period. - <br /> 6/16/2009 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> <br /> ...PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD. NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THECITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAIN' IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WAR TY PERIOD WI BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM.DATE OF ACCEPTANCE OF THE REPAIR. ~ , <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: Balzhiser & Hubbard Engineers <br /> Address: 100 V1/ 13~' Avenue <br /> Eugene, Oregon 97401 <br /> Owner: U of O -Frances Dyke <br /> Address: 195 Franklin Blvd <br /> Eugene,~Oregon 97403 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: ~ <br /> Contractor Engineer Owner Construction Manager File GingerPerales, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> POS Maintenance-Planning Surety. PW Administration PIC Engineering . PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-4\4574 U of O B-Ball Arena-Villard St\Correspondence\Contractors14574-20090618MEWThird Notification.doc March 2009.. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.