New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4502 CDBG Funding
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2009
>
GJN4502 CDBG Funding
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2011 2:09:42 PM
Creation date
5/15/2009 10:59:15 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Correspondence
PW_Active
No
External_View
No
GJN
004502
GL_Project_Number
985084
Retention_Destruction_Date
5/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SMITH Tammy D <br />From:AANDERUD Kris <br />Sent:Friday, May 15, 2009 10:21 AM <br />To:SMITH Tammy D <br />Cc:JOHNSON Eric P; RISDAL Lacey L; GALLUP Steve S <br />Subject:GJN 4502 - PPP Crescent Ave / Coburg / Shadow View <br />Hi Tammy, <br />This is to memorialize the conversations we have had this morning regarding the APS/Access Ramp work <br />for GJN 4502. According to Steve Gallup, they will not be doing this work during the PPP project itself. <br />Federal rules require that with the federal funding used for the PPP, all of the intersections would have <br />to have the same level of work to meet the CDBG/Federal funds requirements. As there was only a <br />desire to do certain intersections, this portion of the project will not move forward. We may choose to <br />retrofit sometime later with future CDBG $$. <br /> <br />Eric confirmed that they have already been in discussions with PDD/Liesl regarding the CDBG funds <br />from FYh09 and that the projects would not be completed by April 1, but would carry through the <br />summer. Due to the nature of the work, it is weather dependent, thus the summer schedule. <br /> <br />You agreed you would confirm this with Matt and request he process a CO to remove this from the <br />existing contract. You will also follow-up with a BJE to put the funding back to the appropriate project <br /># (Ramps 171-975224 and APS 171-975434). <br /> <br />Think that’s it. If I’ve left something out, anyone please chime in. Thanks. Kris <br /> <br /> <br />Kris Aanderud <br /> <br />Parks & Open Space / Maintenance <br />City of Eugene Public Works <br />1820 Roosevelt Blvd., Eugene OR 97402 <br /> <br />phone: (541) 682-4966 - fax: (541) 682-4882 <br /> <br /> <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.