Final Accep#ance Pubi?cworks <br /> Completion of Warranty Period ~ Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 <br /> (541)682-5291 <br /> (541) 682-8410 <br /> To: Eugene Sand and Gravel Date: April 1, 2009 <br /> 3000 N. Delta Hwy _ <br /> Eugene; OR 97440 From: Dan Kepley <br /> Project: E. 18th and Agate <br /> Contract Number: 2007-26 Job Number. 4341,4422, 4442 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects .were noted and/or were corrected. the project is hereby acxepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> Q:\PROJECTS\PROJ-2\4422\Correspondence\Contractors\4422 Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 ~ <br /> <br /> y Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />