Final- Acceptance ~ Pub?icworks <br /> Completion of Warranty Period Engineering <br /> 99 East Broadway, Ste 400 <br /> Eugene, OR 97401 . <br /> (541)682-5291 <br /> (541) 682-8410 <br /> Ta Kipoo; Inc. Date: March 27, 2009 <br /> 90465 Woodnaff St. <br /> Eugene, OR 97402 From: Kali Kreutzer <br /> Project: Applewood Acres Subdivision <br /> Contract Number.. 2008-509 Job Number: 4509 <br /> A warranty inspection has been made on this project in accordance. with Section 00150 of the <br /> City Standard Specifications.and Standard Drawings. <br /> No defects were noted and/or were corrected. the project: is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. Paafic West Engineering, Inc. <br /> Address:. 3610 Goodpasture Loop <br /> P:O. Box70026 ' <br /> Eugene, OR 97401 <br /> Owner. Brian Murry <br /> Address: 4725 ~Ilage Plaza Loop,. Suite 200. <br /> - Eugene, OR 97401 <br /> Q:\PROJECTS\PROJ-9\4509\Correspondence\Contractors\4509-20090327Fina1 Acceptance Completion of Warranty Periodkbk.doc <br /> ~ 1 ~ <br /> <br /> f° <br /> ENG 1122 Contractor File ~ .Engineer Owner Surety PW Admin Construction. Manager~~ Revised 4/04 <br /> <br />