Engineering and Construction Agreement city of Eugene <br /> Public Works Engineering <br /> rte. _ ~~~a - ~ s _ _ 858 Pearl Street <br /> T ~ Eugene, OR 97401 <br /> ~~ob Numher 1J~ -~~ntr~ct Nuii~ber Capital Project Nur>iber 541.682.5291PHONE <br /> . - ° f ~ Y= - ~ - 541.682.5032 FAX <br /> The undersigned Owner requests the Public Improvements as described below: <br /> Type of improvement: <br /> 1 V i S )d ~3 - ~ay, T•ta . r-,~~s~c,.~~r.+-~ s~Y.-,.~..f~-~c.,- ~ y~ 1, .~•~s <br /> (Paving, wastewater,stormwater,streetlig ts) <br /> Location: ~j~R1e R ? ipc <br /> (Street or easement. If a subdivision, print subdivision name) <br /> North or east limit: South or west limit: • <br /> (Except for subdivisions) (Except forsubdivisions) - <br /> bedesigned and constructed during the Zoag or subsequent construction season in.the following manner (check one): <br /> (Year) <br /> 1. As a City engineered and constructed project (eligible for assessment financing). - <br /> City agrees: <br /> (a) to performengineering design, cost estimate; award of contract, construction inspection, and assessment tabulation for the improvements; <br /> (b) to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts as stipulated in the Eugene <br /> Municpal Code. <br /> Owner agrees: <br /> (a) to pay all engineering and construction costs which are not eligible for assessment financing. <br /> (b) if the undersigned owner chooses to discontinue the City engineering and construction process prior to execution of a construction <br /> contract, the owner further agrees to pay all engineering and project-related costs incurred by the City to that point, and to comply with <br /> paragraph 2 below, if applicable. _ <br /> ~2. As a privately engineered and. constructed project with private financing arranged by the Owner. <br /> Owner agrees: <br /> (a) to install all required public improvements at no cost to the City; <br /> (b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other engineering services, all of which <br /> will be billed and payable monthly with final payment due prior to City's final acceptance of the completed improvements. <br /> (c) to provid ethe City a bond, which includes aone-year warranty period, in an amount sufficient to cover all engineering and construction <br /> costs associated with completion of the required public improvements. <br /> (d) to pay other charges and levies for public improvements, if required. Other charges may include, but are not limited to: <br /> 1) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property owner shall be <br /> charged a penalty in the amount of $25 or ten percent (10%) of the past due amount, whichever is greater. Payment of the penalty shall <br /> not constitute a waiver by the City of its other remedies. ' <br /> 2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) per annum from the <br /> due date until paid. This sum shall be in addition to penalty charges. <br /> PROPERTY OWNER CO OWNER CITY OF UGENE <br /> - ilnce,~~ w~l,prL- <br /> ROP TY OWNER'S SIG TURE ~ CO-OWNEfl'S SIGNATURE _ IGNATUflE <br /> 1'I~oun-~~i,~ IZiro~~ ~w~P~~,vr <br /> PROPERTYOWNERY NAME C0.0WNER's NAME ~ TITLE <br /> ~ -~s-®9 ~ 3.23-0'°~- <br /> <br /> ' DATE. DATE DATE . <br /> P~ a3~ Zl ~3to 777 Pearl Street <br /> ADDRESS ADDRESS <br /> ~ ~ Z .Eugene, OR 97401 <br /> aTri izlP aTVisrATErzIP <br /> y3 y/-/~~~ Original to the City of Eugene <br /> - PHONE NUMBER(6usinesshours) PHONE NUMBERfbusi~esshours) CO(JIeS tO Owner, Co-ownerand Inspector <br /> <br />