New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4317 Warranty 9.11.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4317 Warranty 9.11.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 2:53:24 PM
Creation date
1/26/2009 3:41:42 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004317
GL_Project_Number
955654
COE_Contract_Number
2008-00017
Retention_Destruction_Date
9/10/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and PDbuowork$ <br /> <br /> Completion Dates for Contract Projects Enginaedng <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 6825560 <br /> DATE CONTRACT NO. <br /> 5I19I2008 2008-17 <br /> PROJECT NAME JOB NO. <br /> 2008 PPP Mill Street Alley RCC from 12th Avenue to 13th Avenue 4317 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Eugene Sand and Gravel NIA <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Mike Koivula 682-5396 <br /> FIRST NOTIFICATION <br /> 55/0815 THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & 7HE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 6N/08 0 5119lDB <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 619108 <br /> (SEE SUBSECTION 00799.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signaure <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 9111I081S THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATESTHE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE W ITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WARRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> 1 Spector Signature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner. <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner ConsWdion Manager File Damon JOyner,PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As DOnatnlLt Monitor MADD Supervisor Inspector <br /> Q:IPROJECTSIPROJ-714317 Roller compacted conaetelCortespondencelConUactors14317 20080911 3rd Notificafion.doc APRIL 2ooa ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.