Final Acceptance ®Pt,ercwprks <br /> <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541)682-8410 <br /> To: Wildish Construction Date: January 7, 2009 <br /> PO Box 7428 <br /> Eugene OR 97401-0428 From: Dan Kepley <br /> Project: 43'd & Donald Stormwater Capacity Upgrade <br /> Contract Number: 2006-29 Job Number: 4264 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specfications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> Q:\PR0IECTS\PROJ-4\4264\Cortespondence\Contractors\4264-Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4104 <br /> Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br /> <br />