New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4418 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4418 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2009 11:15:07 AM
Creation date
1/2/2009 10:13:08 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004418
GL_Project_Number
975112
COE_Contract_Number
2009-00001
Retention_Destruction_Date
7/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and - <br /> Public Works <br /> Completion Dates for Contract Projects Engineel;ng <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 12/23/2008 2009-01 <br /> PROJECT NAME JOB NO. <br /> Videra Park x}18 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Wildish Construction N/A <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Karl Kreutzer 541-682-8466. 7/03/08 <br /> FIRST NOTIFICATION <br /> 08/05/08 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. I specto ignature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 11/10/08 N/A 11/10/2008 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 11/25/08 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACTPROVISIONSFOR ADDITIONACREQUIREMENTS.) <br /> In pector i ture <br /> THIRD NOTIFICATION <br /> Notice of_Completlon.__Begln Warranty Period. <br /> 11/18/2008 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REO IRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FORREPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORKTHA <br /> BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE O ~-Y A <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> nspeetor gn <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: - <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction_jvlan~ger File Damon Joyner, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: ~ ~`lM <br /> Maintenance-Planning Surety `PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-8\4418\Correspondence\Contractors\4418-20080805KBKThird Notification.doc APRIL ioo4 MC' <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.