STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: City of Eugene EWEB DRAWING <br /> EWEB MAP 22G <br /> DATE: November 19, 2008 <br /> City of Eugene-PWM (Maintenance) ~ <br /> City of Eugene-PWE (Capital and PEPI) <br /> Please provide power and connect 8 watt HPS street lights <br /> These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> PROJECT NAME: SPRING KNOLL 2 Project # 4007 <br /> Developer's Name: Eugene Water & Electric Board <br /> Telephone <br /> COE Rep's Name: Randal Dale Prepared By: D. Kepley <br /> Telephone 682-4961 Telephone 541-682-5349 <br /> REPLY <br /> <br /> - Eugene Water & Electric Board <br /> Attention: Debbie Crampton Multiply # of lights by the monthly rate. <br /> Electric Distribution Supervisor 8 (70 watt HPS) x $3.45 = $27.60 <br /> 1. Connect 8 high pressure sodium street lights as per attached drawing and bill $27.60/month as per <br /> EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bil! City of Eugene (Debbie Clark) for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: $ 325.00 <br /> .5 connections - 5 x 57 + 40 = 325 <br /> Total: $ 325.00 <br /> Agency: ~c~~, ~ Eugene Water & Electric Board <br /> Authorized by: By: <br /> Q:\FORMS\PROJECT\EWEB\StreetLightConstNtc.doc <br /> <br />