New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4544 Warranty 10.31.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4544 Warranty 10.31.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 11:16:15 AM
Creation date
12/22/2008 1:27:13 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004544
GL_Project_Number
985205
COE_Contract_Number
2009-00005
Retention_Destruction_Date
4/30/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT N0. <br /> 11/12/2008 2009-05 <br /> PROJECT NAME JOB NO. <br /> Tonawanda Capacity Upgredes 45q,4 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> H & J Construction <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Keith Jurasevich 54182-5247 9/122008 <br /> FIRST NOTIFICATION <br /> 10/82008 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED 8 THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 11/012008 WA 10/152008 , <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 11/082008 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> InspedorSgnature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 1 0131 2 0 0 8 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3, Jf4, and #5, ALL WORK IS <br /> GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. <br /> MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN <br /> THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN <br /> WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR <br /> WARRANTY PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANC~OF THE AIR. ~ <br /> Inspector gnature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Ovmer Construction Manager File Ginger Perales, PWM <br /> ly. Z)? <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:IPROJECTSIPROJ-4\4544\Correspondence\Contractors14544-20081112 kmj Third Notification.doc APRlL zooa <br /> Ma <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.