New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4544 Eug Sand Warranty 11.17.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4544 Eug Sand Warranty 11.17.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 11:16:15 AM
Creation date
12/22/2008 9:42:11 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004544
GL_Project_Number
985205
COE_Contract_Number
2009-00005
Retention_Destruction_Date
4/30/2019
Sticky Note
ID:
1
Text:
THis is really for GJN4544 Towanda not GJN4599 Towanda.
COntract #2009-00005
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and Public works' <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 11/21/2008 <br /> PROJECT NAME JOB NO. <br /> Tonawand9 Wastewater Force Main 4599 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Eugene Sand & Gravel, Inc. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Keith Jurasevich 541-682-5247 10/282008 <br /> FIRST NOTIFICATION _ <br /> 1026200815 THE DATE ON WHICH THE CONTRACT WORK BEGAN. r Inspe r Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED 8 THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 11/172008 <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 7?/0112006 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> ' ~ Inspector'' <br /> gnatu~ <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 11/17200815 THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> ' REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WffH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT ip, #4, and #5, ALL WORK IS <br /> GUARANTEED BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF.THE CITY'S NOTICE OF WORK COMPLETION. <br /> <br /> _ MANUFACTURE WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN <br /> THE REQUIRED ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN <br /> WORK THAT BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEA <br /> WARRANTY PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTAN E OF HE PAIR. <br /> Inspector ignature <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Man r File Ginger Perales, PWM <br /> M'C <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As ConsVUCt Monitor MADD SuperASOr Inspector <br /> Q:\PROJECTS\PROD-9145991CorrespondencelContractors\4599-20081121 kmj First Second Third Notification.doc APRtC 2004 <br /> M <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.