<br /> - STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: City of Eugene EWEB DRAWING <br /> EWEB MAP 23V <br /> DATE: November 6, 2008 <br /> City of Eugene-PW M , (Maintenance) ? <br /> City of Eugene-PWE (Capital and PEPI) <br /> .Please provide power and connect watt HPS street lights <br /> These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> PROJECT NAME: N. Game Farm Rd. Project # 4376 <br /> Developer's Name: Eugene Water & Electric Board <br /> Telephone <br /> COE Rep's Name: Randal Dale Prepared By: Lisa Jeffryes <br /> Telephone 682-4961 Telephone 682-6231 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crompton Multiply # of lights by the monthly rate <br /> Electric Distribution Supervisor <br /> ( 6(100watt) X $4.35 2(150watt) x $5.45) _ $37.00 <br /> 1. Connect 8 high pressure sodium street lights as per attached drawing and bill $37.00/month as per. <br /> EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill City of Eugene(Debbie Clark) for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connecUdisconnect in same box: $ 211.00 <br /> 3 connections x $57 + $40 for travel = <br /> TotaL• $ 211.00 <br /> Agency: OS Eugene Water & Electric Board <br /> Authorized by: ~ ey: <br /> O:\PROJECTSIPROJ-6\4376\Corcespondencel0thertE W EB\4376-20081106StreetLightConstNtc.doc <br /> <br />