New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4596 10.20.08
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4596 10.20.08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2011 11:44:56 AM
Creation date
11/17/2008 8:43:47 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004596
COE_Contract_Number
2009-00011
Retention_Destruction_Date
10/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 10/20/2008 2009.11 <br /> PROJECT NAME JOB NO. <br /> Delta Ponds Soil Amendment and Seeding 4596 <br /> CONTRACTOR FEDERAL AID PROJECT N0. <br /> Elms Landscape Services <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Scott Milovich 541 662-6086 10116!08 <br /> FIRST NOTIFICATION <br /> 10/20/0815 THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 10/31/08 0 <br /> ALL CLAIMS FOR ADDTf10NAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION ' <br /> Notice of Completion. Begin Warranty Period. <br /> 11(//08 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMEIJiS ` <br /> REQUIRED <br /> U~NDER_THE CONTRACT. n^^ S^eTlnr`ir<i T~=~T =verso ure° ~ D NO ~ <br /> IN ACCORDANCE N,RFI'~ 170 OF THE STANDARD SPECIFICATIONS RANTEED <br /> BY THE CONTRACTOR FOR ONE YF1+ 'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT ON OF NGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YFAR. THE S RESPONSIBLE FOR REPAIRS OR REPLACE Y BY DEFECTS IN WORK THAT <br /> BECOM WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE W WARRANTY <br /> P WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR <br /> Inspector SignaWre <br /> For Privately Engineered Projects Only <br /> Engineer: ' <br /> Address: <br /> Owner: <br /> Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: ~ <br /> Contractor Engineer Omer ConsWClion Manager File Ginger Perales,PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: ~ ~ <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As CenSVIIGt Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-6\4596\Contract\Contracts\Third Notification.doc APFtL 200d ef\~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.