New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4525 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4525 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 9:23:42 AM
Creation date
11/6/2008 2:21:36 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004525
GL_Project_Number
374525
Retention_Destruction_Date
6/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br />Public Works <br />Completion Dates. for Contract Projects Engineering <br />City of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(541) 682-5560 <br />DATE' CONTRACT NO. <br />07/03/08 2008-516 <br />PROJECT NAME JOB NO. <br />8~' Ave Renovation 4525 <br />CONTRACTOR FEDERAL AID PROJECT NO. <br />H & J Construction N/A <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Charle Perini 541-682-5230 N/A <br />FIRST NOTIFICATION <br />03/24/08 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />N/A N/A N/A <br />WA N/A N/A <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: N/A <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />07/03/08 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK tS GUARANTEED <br />BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br />WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br />ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br />BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE- R WARRANTY <br />PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE AI <br />In ector Signature <br />For Privately Engineered Projects Only <br />Engineer: Weber Elliott Engineers P.C. <br />Address: PO Box 10145 <br />Eugene, OR 97440 <br />Owner: Metropolitan Affordable Corporation <br />Address: 1430 Pearl Street <br />Eugene, OR 97401 <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Manager File Damon Joyner, PWM <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Maintenance-Planning Surety PIN Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />C7° <br />G <br />Q:\PROJECTS\PROJ-5\4525 8th Ave\Correspondence\Contractors\4525-20080703 Third Notification.doc APRIL 2004 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.