Notification of Commencement and <br />Completion Dates for Contract Projects <br />Public Works <br />Engineering <br />City of Eugene <br />244 E. Broadway <br />Eugene, OR 97401 <br />(5411682-5560 <br />DATE CONTRACT NO. <br />5/30/2008 2007-0508 <br />PROJECT NAME JOB NO. <br />LTD BUS RAPID TRANSIT FRANKLIN CORRIDOR FRANKLIN SEGMENT 4332 <br />CONTRACTOR FEDERAL AID PROJECT NO. <br />Wildish Construction N/A <br />INSPECTOR PHONE NUMBER DATE OF AWARD <br />Keith Jurasevich 541 682-5247 N/A <br />FIRST NOTIFICATION <br />1-23-06 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br />SECOND NOTIFICATION <br />SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br />BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br />COMPLETION <br />WA WA WA <br />ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: N/A <br />(SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br />Inspector Signature <br />THIRD NOTIFICATION <br />Notice of Completion. Begin Warranty Period. <br />9/3/07 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK <br />EQUIPMENT AND <br />, <br />PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br />REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br />IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br />BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br />WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br />ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br />BECOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR WAF~RANTY <br />PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE R PAI Il.. <br />Inspect Signature <br />For Privately Engineered Projects Only <br />Engineer: Parson Brinckerhoff Quade & Douglas Inc. <br />Address: 400 SW 6th Avenue, Suite 802 <br />Portland, OR 97204 <br />Owner: Lane Transit District <br />Address: 3500 E. 17th Avenue <br />Eugene, OR 97403 <br />DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br />Contractor Engineer Owner Construction Managert~ File <br />ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br />Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br />~' <br />r.1 <br />Q:\PROJECTS\PROJ-2\4332 MX-LTD\Correspondence\Contractors\4332-20080530 3rd Notification.doc APRIL 2ooa <br />