Final Acceptance <br />Completion of Warranty Period <br />Public Works <br />Engineering <br />244 East Broadway <br />Eugene, OR 97401 <br />(541)682-5560 <br />(541) 682-8410 <br />To: Greensuns Construction <br />P.O. Box 71698 <br />Eugene OR 97401 <br />Date: June 2, 2008 <br />From: Kris Olson <br />Project: Rivendell <br />Contract Number: 2006-520 <br />Job Number: 4386 <br />A warranty inspection has been made on this project in accordance with Section 00150 of the <br />City Standard Specifications and Standard Drawings. <br />No defects were noted and/or were corrected .the project is hereby accepted by the City for <br />permanent maintenance. <br />5~T <br /> <br />FOR PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer: Poage Engineering & Surveying, Inc <br />Address: P.O. Box 2527, <br />Eugene, OR 97402 <br />Owner. Boyd Iverson <br />Address: 1872 Willamette St. <br />Eugene, OR 97401 <br /> <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin!: Construction Managers Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />