<br /> Final Acceptance ®Fubl;cwortcs <br /> <br /> Completion of Warranty Period Engineering <br /> 244 East Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> (541)682-8410 <br /> To: Eugene Sand & Gravel Date: October 2008 <br /> PO Box 1067 <br /> Eugene, OR 97440 From: D ni Du o <br /> R <br /> Project: Airport Flightcraft 42" Storm Relocation <br /> Contract Number. 2008-07 Job Number. 4477 <br /> A warranty inspection has been made on this project in accordance with Section 00150 of the <br /> City Standard Specifications and Standard Drawings. <br /> No defects were noted and/or were corrected the project is hereby accepted by the City for <br /> permanent maintenance. <br /> FOR PRIVATELY ENGINEERED PROJECTS ONLY <br /> Engineer. <br /> Address: <br /> Owner. <br /> Address: <br /> Q:\PR07ECTS\PRO1-7W477\Correspondence\Contractors\4477-20081020 Final Acceptance Completion of Warranty Period.doc <br /> ENG 1122 Contractor File Engineer Owner Surety PW Admin ConsUuclion Manager ilf£~.t/ Revised 4104 <br /> Finance/AccLS Receivable for assessable projects or Ciry Recorders Office for nonassessable projects m~ <br /> <br />