STREET LIGHT CONSTRUCTION NOTICE <br />AGENCY: City of Eugene EWEB DRAWING #: <br />EWEB MAP #: E-19T <br />,DATE: September 17, 2008 <br />City of Eugene-PWM (Maintenance) ~ ^ <br />City of Eugene-PWE (Capital and PEPI) <br />Please provide power and connect 5 70 watt HPS street lights <br />These plans are outlined belowand shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />PROJECT NAME: Rosewood Meadows- <br />. Project # 4522 <br />Developer's Name: Chris Houser Eugene Water & Electric Board <br />Telephone #: 541-954,5108 <br />COE Rep's Name: Raridal Dale Prepared By: Karl Kreutzer <br />Telephone #: 682-4961 Telephone #:.541-682-8466 <br />Eugene Water & Electric Board <br />Attention: Debbie Crampton <br />Electric Distribution Supervisor <br />REPLY <br />Multiply # of lights by the monthly rate <br />S lights x rate for 70 Watt Lights = 5 <br />lights x $3.45 = $17.25 <br />1. Connect 5 high pressure sodium street lights as per attached drawing and bill $17.25/month as per.. <br />EWEB J-4 street light schedule. <br />Preliminary billing is as follows: <br />.EWEB to bill Chris Houser for the following work: <br />Ditch: <br />Duct: <br />Other: <br />Transfer: <br />New Installation or connect/disconnect in same box: <br />(5 connections x $57 + $40 for travel) <br />Agency: ~~ ~~-. C3~ ~tfGL-~/.i~ ~tR/~ <br />Authorized by:~~~,c-y ~"VC/-~ <br />$ 325.00 <br />Total: $ 325.00 <br />Eugene Water & Electric Board <br />By: <br />Q:\PROJ ECTS\PROJ-2\4522\Correspondence\Other\EWEB\4522-20080917kbkStreetLightConstNtc.doc <br />