CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DNISION <br />Change Order <br />CONTRACTOR: Wlldish Conahuclion Co. <br />(ADDREBB) PO Box 7428 <br />Eugene OR 97401.0248 <br />PROJECT: 2008 Pavement Preaervatbn Program 1) Chad Dr. tram E. end to Coburg Rd <br />(Job #442312) Barger Dr from Primrose to Tern St. (Job #4433) <br />3) Barger Dr horn Fhvy 99 to Altlmont St (Job (+4483) <br />You are directed to make the following changes in this contract: <br /> <br />Job # <br />contrea a 2ooa-2z <br />Change Order a 3 <br />Dale: 07/22/08 <br />CAMS Dete: <br /> <br />Reviewed by: Dele: <br />Inspector: D Keolev. <br /> K Marwitz <br />Prof. Mar M. Rodrigues <br />Principal Eng. P. Kloae <br />~tem~ ~~ <br />No. Item Time <br />Chan a Quantity <br />(Units Unit <br />Cost <br />Amount <br />+/-) Amended <br />Change Net <br />Change <br />70 Surface Sbbipzatlon anal 200.00 TON 90.00 18 000.00 538,943.00 <br /> (Job #x4483) Revised 632.70 TON 90.00 56943.00 <br /> Amended 0.00 E0.00 .00 tA.00 <br /> final 0.00 .00 .00 ;0.00 <br /> Revised D.00 .00 .00 <br /> Amended 0.00 .00 0.00 50.00 <br /> Inal 0.00 .00 0.00 50.00 <br /> Revised 0.00 .00 .00 <br /> Artrended 0.00 .00 .00 0.00 <br /> Ori final 0.00 .00 .00 $0.00 <br /> Revised 0.00 .00 0.00 <br /> Amended 0.00 0.00 0.00 .00 <br /> nal 0.00 .00 0.00 50.00 <br /> RMsed 0.00 .00 .00 <br /> Amended 0.00 .00 0.00 .00 <br /> nal 0.00 .00 .00 50.00 <br /> Revised 0.00 .00 .00 <br /> Amended 0.00 .00 x.00 .00 <br />The original contrect work days are D.o da s <br />The contract time change this C.O 0.o da <br />The contract time change by previous C.O.'s o.o dafrs <br />The new contrect work da are 0.0 da a <br />The original ~ntrect sum was _,_„~~._,,.,. _______......_____..._... ~_...._.... <br />Net change by previous change order _____.__..._________. .__._.___ <br />Net change due to amendment by prevaus change order ,_,.,.____~_„~_~.___________„,,,,_„.,__,_,,. <br />The contract sum priorto this change orderwas ~,,,._,,,,.,,,______„_,_. <br />This change order will change contract sum by this amount ~~_,,,,,__,,,,,,,,,,,,,,~,,,,.,_..____~_._ __ <br />The new contract net change sum .,.,.,_.,_.._,...,...,.,,._________~ .._. _ <br />The new contract amendment sum .____, ,,,,,_„_,_,,,_,_„~_,„„„„_,,,,__ _,,,,, ._ <br />The new contract sum including this change order will be .,_,____~_„.___,__._~-,__....,__._ __......_.._.~_._._. <br />Percents a of on final contract <br />N FUNGEDU OAMENDME <br />Appro 61 b <br />City Engi eel Prime Contractor <br />/~ <br />Date Date <br />CONTRACTOR ~ OFFICE FILE ~ PURCHASINCifCRO <br />5926An.oo <br />so.oo <br />563,822.89 <br />5989.839.69 <br />538.943.00 <br />S38,943.00 <br />563,822.89 <br />51.028.782.69 <br />1t.t0% <br />89% <br />Third Party <br />Date <br />O~FORMSIPROJECTtCONSTUtEViSED CHANGE ORDER.JO_S <br />This changes the bid items as follows: <br />