STREET LIGHT CONSTRUCTION NOTICE <br />AGENCY: City of Eugene <br />EWEB DRAWING #: <br />EWEB MAP #: E-17X <br />DATE: June 20, 2008 <br />City of Eugene-PWM (Maintenance) ^ <br />City of Eugene-PWE (Capital and PEPI) <br />Please provide power and connect 8 70 watt HPS street lights <br />These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />~k <br />PROJECT NAME: Lone Oaks Subdivision -Lone Oak Ave, Ross Ln, Justine Ln <br />and Justine Ct. <br />Project # 4333 <br />Developer's Name: Dean Schmidt Eugene Water & Electric Board <br />Telephone #: 541-868-1850 <br />COE Rep's Name: Randal Dale Prepared By: Karl Kreutzer <br />Telephone #: 682-4961 Telephone #: 541-682-8466 <br />Eugene Water & Electric Board <br />Attention: Debbie Crampton <br />Electric Distribution Supervisor <br />REPLY <br />Multiply # of lights by the monthly rate <br />8 lights x rate for 70 Watt Lights = 8 <br />lights x $3.45 = $27.60 <br />1. Connect 8 high pressure sodium street lights as per attached drawing and bill $27.60/month as per <br />EWEB J-4 street light schedule. <br />Preliminary billing is as follows: <br />EWEB to bill Dean Schmidt for the following work: <br />Ditch: $ <br />Duct: $ <br />Other: $ <br />Transfer: $ <br />New Installation or connect/disconnect in same box: $ 191.00 <br />(3 connections x $47 + $50 for travel) <br />Agency: <br />Authorized by: <br />Total: $ 191.00 <br />Eugene Water & Electric Board <br />By: <br />O:\PROJ ECTS\PROJ-3\4333\Correspondence\Other\EWEB\4333-20080619StreetLightConstNtc.doc <br />