STREET LIGHT CONSTRUCTION NOTICE <br />AGENCY: EWEB DRAWING #: <br />EWEB MAP #: E-24L <br />DATE: May 1, 2008 <br />City of Eugene-PWM (Maintenance) <br />City of Eugene-PWE (Capital& PEPI) _X_ <br />Please provide power and connect 4, 70 watt HPS street lights <br />These plans are outlined below and shown on the attached drawing: <br />EWEB CONSTRUCTION PLANS <br />PROJECT NAME: EAST 25'" AVENUE Project # 4364 <br />Developer's Name: Alpesh Patel Eugene Water & Electric Board <br />Telephone #: 541-342-4804 <br />COE Rep's Name: Randal Dale Prepared By: Keith Jurasevich <br />Telephone #: 682-4961 Telephone #: 541-682-5247 <br />Eugene Water & Electric Board <br />Attention: Debbie Crampton <br />Electric Distribution Supervisor <br />REPLY <br />4x$3.10=$12.40 <br />1. Connect 4 high pressure sodium street lights as per attached drawing and bill $12.40/month as per <br />EWEB J-4 street light schedule. <br />Preliminary billing is as follows: <br />EWEB to bill Alpesh Patel for the following work: <br />Ditch: $ <br />Duct: $ <br />Other: EWEB to complete Pole Dip (and calculate price). $ ???? <br />Transfer: $ <br />New Installation or connect/disconnect in same box: (1 x $47) + $50 $ $97.00 <br />Total: <br />Agency: ~ ~h- <br />Authorized by:/ <br />8-15-03 <br />$ ~~?? <br />Eugene Water & Electric Board <br />By: <br />Q:\PROJECTS\PROJ-4\4364\Construction\Post Construction\#4364-20080501 kmj StreetLightConstNtc.doc <br />