October 4, 2 02 <br /> CONTACT: Eric Jones, Public Affairs Manager, 682-5523 <br /> ~ FOR IMME IATE RELEASE <br /> REVISED: LEASE USE THIS VERSION <br /> WATCH FOR CONSTRUCTION ON SEVERAL EUGENE STREETS <br /> <br /> i <br /> Mot rists should be on the lookout for lane closures and brief delays in the area of two <br /> Eugene Pu lic Works projects during the week of October 7. <br /> On efferson Street between 15th and 17`h avenues, traffic will be narrowed to one lane, <br /> controlled b flaggers, between 7 a.m. and 4 p.m. Monday through Friday, October 7-11. The <br /> City and its ontractor are repairing wastewater lines in the general area bounded by Jefferson <br /> and Olive s rests and 15th and 24`h avenues. To avoid delays, use alternate routes, preferably <br /> outside the eneral work area. <br /> A to alized wastewater installation job will require the temporary closure of the easterly <br /> lane on Pe rl Street south of 13`h Avenue Monday through Wednesday, October 7-9. Watch for <br /> flaggers an anticipate lane merges. <br /> For p-to-date reports on road construction, call the City of Eugene traffic relief hotline <br /> at 984-848 , or on the web at www.ci.eugene.or.us/pw/traffic. <br /> NOTE TO DITORS: THE WORK AT BROADWAY AND OAK HAS BEEN POSTPONED <br /> UNTIL FU THER NOTICE <br /> blMs W~arlts . ~1r~dw~ «Clty ~ one •858 Peaif Street s Eugene, OFi 97401 <br /> Pt~onet ~~i1) 682-5~8~ r ~hXs (341)682.-+~~ r wws~r,.t~.et,~gr~rla,ot,us <br /> <br />