New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Union Pacific Starts Work to Upgrade Railroad Crossings at Six Locations in Eugene (2)
COE
>
PW
>
Admin
>
Public Affairs
>
2003
>
Union Pacific Starts Work to Upgrade Railroad Crossings at Six Locations in Eugene (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2008 3:14:40 PM
Creation date
8/28/2008 3:14:40 PM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Subject_Public_Affairs
Traffic Controls
External_View
No
PWA_Release_Date
5/22/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- - ~ ~ ,o ~ ,o <br /> May 22, 2 03 <br /> CONTAC Tom Larsen, Traffic Engineer, (541) 682-4959 <br /> From Publ c Information Section, (541) 682-5523 <br /> FOR IMM DIATE RELEASE <br /> Union acific Starts Work to Upgrade Railroad Crossings at Six Locations in Eugene <br /> Un on Pacific Railroad is scheduled to begin work next Tuesday, May 27, to upgrade six <br /> railroad cr ssings in Eugene. <br /> Fo the first week, crews will sawcut paving and generally prepare for construction at the <br /> six crossin s: Hilyard at Eighth Avenue (just east of the former Agricpac plant), High Street at <br /> Fifth Aven e, and Pearl, Lincoln, Lawrence, and Washington streets north of Fifth Avenue. <br /> During the preparation phase, traffic in the work zones will be limited to one lane controlled by <br /> flaggers, a d motorists may experience brief delays. <br /> Be inning June 2, crews are scheduled to begin the actual construction, which consists <br /> <br /> ~ of rebuildin the crossings with concrete pavement. To allow adequate time for the excavation <br /> of the exist ng paving and rubberized crossing materials and the installation of preformed <br /> concrete p nets, the intersections will be closed for two or three days and through traffic will be <br /> directed to se alternate routes. <br /> On a the work has been completed on the six intersections between Hilyard and <br /> Washingto streets, Union Pacific will determine its schedule for upgrading the remaining <br /> railroad cro sings in Eugene. <br /> Up ated information on the construction project will be provided on the City of Eugene's <br /> traffic relief hotline, 984-8484, and on the city's web site at www.ci.eugene.or.us/pw/traffic. <br /> Pu Ilc Works • Administration • City of Eugene • 858 Pearl Street • Eugene, OR 97401 <br /> Phone: (541) 682-5262 • FAX: (541) 682-6826 • www.ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.