i <br /> <br /> Ii it <br /> i <br /> October 19,'I2007 <br /> CONTACT: Patrick Cox, Project Manager, 541-682-6854 <br /> I <br /> From Public Information Section, 682-5523 or 954-2938 <br /> FOR IMME[~IATE RELEASE <br /> i Traffic Advisory <br /> <br /> III I Closure of Broadway between Willamette & Olive begins Friday <br /> <br /> ' The project to replace bricks on Broadway Street has moved to the west side of Willamette <br /> <br /> I~ St., resulting in a street closure between Willamette & Olive St. beginning October 19~h. The street <br /> will remain dosed for several weeks while new concrete is being installed. <br /> <br /> II~ The,, $144,000 project includes removing failed brickwork on Broadway and replacing it <br /> <br /> ~ with continuously reinforced decorative concrete. Brown Contracting of Eugene is doing the work <br /> and the Euglene Public Works Engineering Division is managing the project. <br /> Decorative concrete has been installed on Broadway between Oak and Willamette. <br /> Barricades ~ aye been removed, making public access on this section of Broadway possible. <br /> Side alks and business access will remain open at all times. <br /> For wpdates on this project or information about roadwork in the Eugene area, call the <br /> <br /> ~ Metro Roadrnrork Hotline at 984-8484, or on the web at www.eugene-or.gov/traffic. <br /> I <br /> <br /> I <br /> <br /> ~I ~I <br /> I <br /> ~I <br /> I <br /> <br /> III I <br /> ~I <br /> II <br /> Eugene Public Works • www.eugene-or.gov/pw <br /> 858 Pearl Street, Eugene, Oregon 97501 • 541-682-5523 • fax 541-682-6826 • e-mail pwadmin@ci.eugene.or.us <br /> <br />