New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Work Scheduled to Start May 2 on River Avenue Improvement Project
COE
>
PW
>
Admin
>
Public Affairs
>
2007
>
Work Scheduled to Start May 2 on River Avenue Improvement Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 12:25:00 PM
Creation date
8/8/2008 11:55:27 AM
Metadata
Fields
Template:
PW_Public_Affairs
PW_Document_Type_Public_Affairs
News Release
PW_Division
Engineering
PW_Subject_Public_Affairs
Road Repairs
External_View
Yes
PWA_Release_Date
4/30/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
April 30, 2047 <br /> CONTACT: Project Manager Joe Ramirez, 541-682-5228 <br /> From Public Information Section, 682-5523 or 954-2938 <br /> FOR IMMEDIATE RELEASE <br /> i <br /> Work Scheduled to Start May 2 on River Avenue Improvement Project <br /> With utility work substantially completed by EWER, Qwest and Comcast, the City's <br /> contractor is gearing up to improve River Avenue between River Road and Beltline. Delta Sand & <br /> Gravel is the general contractor for the project, which is scheduled to begin Wednesday, May 2. <br /> ' The Public Works Engineering Division is managing the project. <br /> The street design was a collaborative effort involving residents and businesses on River <br /> Avenue and representatives from local neighborhood groups and the Eugene Bike Coalition. When <br /> completed in the fall, the one-mile-long street will include two vehicle travel lanes and a center turn <br /> lane, curb and gutter, sidewalks along the full length of the north side of the street, bike lanes on the <br /> 1 west end of the street and a 12-foot-wide multi-use path on the east end, street trees, stormwater <br /> I <br /> bioswales for water quality treatment, a parking bay at the east end, and street lights. <br /> Funding for the $3.3 million project is coming from assessments to abutting property owners <br /> and from a mix of transportation, stormwater and wastewater system development charges. <br /> During construction, at least one lane wilt be open at all times. Traffic will be controlled by <br /> flaggers dining the contractor's work hours. Construction updates will be provided on the City's <br /> traffic relief web site, www.eugene-or.gov/traffic and on the metro roadwork hotline, 984-8484. <br /> For more information, visit the project web site at www.eugene-or.gov/pwprojects (from the <br /> j list of projects on the left, click on the River Avenue link). <br /> <br /> i <br /> Eugene Public Works • www.eugene-or.gov/pw <br /> 858 Pear! Street, Eugene, Oregon 97501 • 541-682-5523 • fax 541-682-6826 • e-mail pwadmin@ci.eugene.or.us <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.