New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4481 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4481 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 9:17:24 AM
Creation date
7/10/2008 3:42:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004481
GL_Project_Number
374481
Identification_Number
Begin Warranty
COE_Contract_Number
2008-00507
Retention_Destruction_Date
3/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V <br /> <br /> Notification of Commencement and Public Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> PATE CONTRACT NO. <br /> $/17/2008 2008-507 <br /> ~'ROJECT NAME JOB NO. <br /> Kyle Estates 4481 <br /> CONTRACTOR FEDERAL AID PROJECT N0. <br /> '..Pacific Excavation, Inc. <br /> 'INSPECTOR PHONE NUMBER DATE OF AWARD <br /> 'GI n A.Fee 541-682-5195 <br /> tFl ST NOTIFICATION <br /> 9, 2007 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> $f~COND NOTIFICATION <br /> $P~CIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 2/26/2008 <br /> ALL. CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> X IRD NOTIFICATION <br /> ~l~tice of Completion. Begin Warranty Period. <br /> 3!17/2008 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND J <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS T <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. ~j <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and ti4, ALL WORK IS GUARANTEED ~ <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BEICOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR W RANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPA <br /> Inspector Sig --r 1 <br /> jl For Privately Engineered Projects Only d\ <br /> E gineee Olson & Morris <br /> lA~dress: 380 Q St., Suite 200 <br /> Springfield, OR 97477 <br /> 'Owner: John P. Hammer <br /> Address: P.O.BOX 2266 <br /> Eugene, OR 97402 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Damon Joyner, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-1\4481\Correspondence\Contractors\4481 20080317 Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.