New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4462 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4462 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:58:19 PM
Creation date
7/10/2008 2:42:59 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004462
GL_Project_Number
374462
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00517
Retention_Destruction_Date
5/29/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Publlc Works <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> TE CONTRACT NO. <br /> 5 8/2007 2007-517 <br /> P~20JECT NAME JOB NO. <br /> TNft Street <br /> CONTRACTOR FEDERAL AID PROJECT N0. <br /> ugene Sand & Gravel, Inc <br /> I(<JSPECTOR PHONE NUMBER DATE OF AWARD <br /> arl Kreutzer 541-682-8466 <br /> F St NOTIFICATION <br /> 0508/07 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> Sf~ECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> II 05/16/07 <br /> ALI. CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: 06/01/07 <br /> (SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> 'TI~IRp NOTIFICATION <br /> N~tice of Completion. Begin Warranty Period. <br /> 0 2/07 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> P NT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> R QUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> i <br /> IN'ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT /Ki, ALL WORK IS GUARANTEED BY THE <br /> 'CbNTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> R MAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRE ONE YEAR. <br /> T E CQNTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN K THA COME (DENT <br /> W THIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEA IOD L <br /> R QUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. ~ <br /> cto i <br /> For Privately Engineered Projects Only <br /> Engineer: EGR & Associates <br /> Address: 25358 Prairie Road <br /> Eugene, OR 97402 O 5 - - 0 7 A ~ $ : 3 3 I <br /> Owner: James N. Gaston <br /> Address: 1105 Ogle Ave <br /> Eugene, OR 97402 <br /> 'DIt;TRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Damon Joyner, PWM <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE AS Construct Monitor MADD Supervisor Inspector <br /> <br /> O:\PROJECTS\PROJ-2\4462\Correspondence\Contractors\4462 - 20070516KBK Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.