<br /> .r, s I~ <br /> STREET LIGHT CONSTRUCTION NOTICE \VI <br /> AGENCY: EWEB DRAWING <br /> EWEB MAP E-10U <br /> DATE: November 22, 2006 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) _X <br /> Please provide power and connect 6 - 70 watt 120 volt HPS street lights <br /> These plans are outlined below and shown on the attached drawing: <br /> I <br /> EWEB CONSTRUCTION PLANS <br /> Cedar Brook Subdivision Project # 4414T -Cedar Brook Drive and Edna Way <br /> Developer's Name: Bruce Wiechert Eugene Water & Electric Board <br /> Telephone #:686-9458 <br /> COE Rep's Name: Randal Dale Prepared By: Rick Foss <br /> Telephone 682-4961 Telephone (541) 682-8307 <br /> PO Good Job # 4414T <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> (6 x $3.15=$18.90) <br /> 1. Connect (6) high pressure sodium street lights as per attached drawing and bill $$18.90/month as <br /> per EWEB J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> EWEB to bill $285.00 to Developer Bruce Wiechert for the following work: <br /> Ditch: $ <br /> I' <br /> Duct: $ <br /> i <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: (5 x $47.00 + $ 285.00 <br /> $50.00=$285.00 <br /> Total: $ 285.00 <br /> Agency: Eugene Water & Electric Board <br /> Authorize ^-ti7 By: 1 ~ ZZ ~ o <br /> 8-15-03 1 1 - ~ ] - J U ` , . l i <br /> Q:\PROJECTS\PROJ-4\4414\Correspondence\Other\4414T-20061122-StreetLightConstNtc. doc <br /> <br />