New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4412 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4412 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:47:09 PM
Creation date
7/10/2008 11:17:31 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004412
GL_Project_Number
374412
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00506
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Watification of Commencement and <br /> Public Works <br /> Gdmpletion Dates for Contract Projects Engineering <br /> City of Eugene <br /> ~ 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DATE CONTRACT NO. <br /> 8!2912007 2007-506 <br /> PF20JECT NAME JOB NO. <br /> !At?<rie Park Subdivision <br /> 'CONTRACTOR FEDERAL AID PROJECT N0. <br /> Delta Sand & Gravel <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Mlcha~l E. Wilson 682-2748 4-28-2006 <br /> ~IRST NOTIFICATION <br /> 9~5-2006 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. <br /> Inspector Signature <br /> $ECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> N/A WA WA <br /> AI.L CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> ($EE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION y <br /> Npti'oe of Completion. Begin Warranty Period. <br /> 8/$9/2007 ISTHE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND " <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> Rt~QUIREp UNDER THE CONTRACT. THIRD NOTIRCATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN'~ACCORDANCE W ITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> Bl", THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE _ <br /> WARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY iF GREATER THAN THE REQUIRED <br /> O{~E YEAR. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BEiCOME EVIDENT WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE E-YEAR W RRANTY <br /> PE)ZI(aD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF REP ~ ~ J <br /> Inspector Signature <br /> For Privately Engineered Projects Only <br /> EnOineer: Goebel Engineering & Surveying <br /> Address: 310 Garfield Street <br /> Eugene, OR 97402 <br /> Owner: Chris Rowe <br /> Address: 1450 West 7`h Ave. <br /> Eugene, OR 97402 <br /> ISTRGBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> Q:\PROJECTS\PROJ-2144121CorrespondencelContractors\4412-200706213RDMEWNotification.doc APRIL 2ooa <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.