LIGHT CONSTRUCTION NOTICE 1 <br /> STREET <br /> AGENCY: EWER DRAWING <br /> j EWEB MAP E-21 R <br /> DATE: February 14, 2007 <br /> ~ City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) _X <br /> Please provide power and connect 3 - 70 watt HPS street lights <br /> These plans are outlined below and shown on the attached drawing: <br /> EWEB CONSTRUCTION PLANS <br /> PROJECT NAME --Project 4403 - Turnberry Court <br /> Developer's Name: Tom Walter Eugene Water & Electric Board <br /> Telephone #:484-5432 <br /> COE Rep's Name: Randal Dale Prepared By: Jerry Brule <br /> Telephone 682-4961 Telephone 682-5522 <br /> PO Good Job # 4403 <br /> I <br /> ~ REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton <br /> Electric Distribution Supervisor <br /> 3X$3.10=$9.30Imo. <br /> 1. Connect (3 - 70 Watt) high pressure sodium street lights as per attached drawing and bill $ <br /> 9.30/month as per EWEB J-4 street fight schedule. <br /> ~ Preliminary billing is as follows: <br /> ~ EWEB to bill Developer for the following work: <br /> <br /> ' Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> Transfer: $ <br /> New Installation or connect/disconnect in same box: (3 times $ 47 + $ 191.00 <br /> $ } <br /> 50 for travel <br /> Total: $ 191.00 <br /> Agency: City o u ne Eugene Water & Electric Board <br /> j Authorized by: BY~ <br /> 8-15-03 <br /> Q:\PROJ ECTS\PROJ-3\4403\Construction\Post-Construction\4403-StreetLightConstNtc.doc <br /> <br />