New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4399 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4399 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 4:29:47 PM
Creation date
7/10/2008 10:43:11 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004399
GL_Project_Number
374399
Identification_Number
Begin Warranty
COE_Contract_Number
2007-00502
Retention_Destruction_Date
11/3/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I <br /> gtification of Commencement and <br /> Public Works <br /> dmpletion D tes for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> DATE CONTRACT NO. <br /> 11 /6/2007 2007-502 <br /> PROJECT NAME JOB NO. <br /> J~ le Ridge Subdivisio <br /> ONTRACTOR FEDERAL AID PROJECT N0. <br /> ELTA CONSTRUC ION, 999 Division Avenue, Eugene, Oregon 97404 N/A <br /> I SPECTOR PHONE NUMBER DATE OF AWARD <br /> N4ichael E. Wilson 682-2748 N/A <br /> FIRST NOTIFICATI N <br /> 9/11/2007 IS THE DATE N WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFIC TION <br /> Sf~ECIFIED COMPLETI N DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 7/30/2007 <br /> i <br /> i <br /> AL~. CLAIMS FOR ADDI ONAL COMPENSATION MUST BE SUBMITTED BY: 8/30/2007 <br /> (9EE SUBSECTION 00 99.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> T~iIRD NOTIFICAT ON <br /> N tice of Completi n. Begin Warranty Period. <br /> 11J02/2007 IS THE DAT ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> I PLANT REMOVAL, SIT CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER TH CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WIT SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #3 and #4, ALL WORK IS GUARANTEED <br /> B THE CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> RRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> O E YEAR. THE CON RACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEF_EC~TSAIN- W/ORK THAT <br /> B COME EVIDENT WI HIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADEWIc~~E[tf~C~E`W Wi't <br /> P RIOD WILL BE REQ IRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF E REEP <br /> i <br /> I I Inspector Signature <br /> For Privately Engineered Projects Only <br /> Ehgineer: Gebel Engineering and Surveying <br /> Address: 31 GarFeld St, <br /> E gene Oregon 97402 <br /> i <br /> Owner: Jo eph Shapitka <br /> Address: 42 Terra Linda Avenue <br /> E gene, Oregon 97404 - ~ - 1 I <br /> DISTRIBUTION FOR FI ST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File Damon Joyner, PWM <br /> ADDITIONAL DISTRIB TION FOR THIRD NOTIFICATION: <br /> Maintenance-Pla Wing Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> <br /> q:\PROJECTS\PROJ-9\4 99\Correspondence\Contractors\439920071106MEW Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.