T - <br />I <br />Fin 011 Acceptai <br />Cornbletion of <br />rranty Period <br />To: Eugene Sa & Gravel <br />P.O. BOX 1967 <br />3000 Delta Hwy. North <br />Eugene,O on 97440 <br />Prdject: CASTR SUBDIVISION <br />Contract Number: 1 2006 - 515 <br />~NV~ <br />1W Public Works <br />Engineering <br />244 East Broadway <br />Eugene, OR 97401 <br />(541) 682-5560 <br />(541)682-8410 <br />Date: September 28, 2007 <br />From: Michael E. Wilson <br />Job Number, - -4W <br />A warranty in pection has been made on this project in accordance with Section 00150 of the <br />City Standa Specifications and Standard Drawings. <br />No defects ere noted and/or were corrected the project is hereby accepted by the City for <br />permanent maintenance. <br />10-02- <br />PRIVATELY ENGINEERED PROJECTS ONLY <br />Engineer T <br />e Favreau Group Civil Engineering <br />Address: 3 <br />12 Norwich Ave. <br />E <br />gene, Oregon 97408 <br />Owner <br />n Smith <br />Address: 2 <br />08 Park View Dr. <br />u <br />gene, Oregon 97408 <br />ENG 1122 Contractor File Engineer Owner Surety PW Admin Construction Manager Revised 4/04 <br />Finance/Accts Receivable for assessable projects or City Recorders Office for nonassessable projects <br />