New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4366 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4366 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:38:43 PM
Creation date
7/10/2008 9:54:03 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004366
GL_Project_Number
374366
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00509
Retention_Destruction_Date
6/14/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Notification of ommencement and J <br /> Public Works R <br /> <br /> Completion Da es for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541)682-5560 <br /> Dl~TE CONTRACT NO. <br /> 6/4/2006 2006-509 <br /> PI20JECT NAME ~ JOB NO. <br /> Cgburg Rd Median any Signal Improvements 4366 <br /> CONTRACTOR ' FEDERAL AID PROJECT N0. <br /> Lantz Electric, Inc., 3 531 Hwy 58, Eugene, OR 97405 <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Glen A. Fee 682-5195 <br /> ~IR$T NOTIFICATI N <br /> j IS THE DATE ON RICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFIC TION <br /> 5P)=CIFIED COMPLETI N DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED ~ THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> 15!2006 <br /> i <br /> AL ~ CLAIMS FOR ADDI ONAL COMPENSATION MUST BE SUBMITTED BY: <br /> i (S~E SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> ~Tf'iIRD NOTIFICAT ON <br /> ;Notice of Completi n. Begin Warranty Period. <br /> 6/14/2006 IS THE DATE N WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SIT CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER TH CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WIT SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> BY THE CONTRALTO FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE <br /> WiARRANTIES REMAIN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE CON RACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> B~COME EVIDENT WI HIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE- EAR WARRANTY <br /> P RIOD WILL BE REQ IRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. °_~j/ <br /> Inspector Signa <br /> For Privately Engineered Projects Only <br /> E gineer: S & W Engineering <br /> A~dress: 2 50 Oakmont Way, Suite 105 <br /> E gene OR 97401 <br /> Owner. S eve Korth, McKay Investment Co. LLC ` <br /> Address: 2 50 Oakmont Way, Suite 204 <br /> E gene OR 97401 <br /> DISTRIBUTION FOR FII.2ST, SECOND, AND THIRD NOTIFICATION: <br /> I Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-PI nn(ng Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-6\4366\Correspondence\Contractors\4366 20060614 Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.