~ i , <br /> <br /> ~~n ~ ~e~ring and ~ <br /> g ~ Public Wo~CS <br /> Cons ruction Agreement X33 Engineering <br /> City of Eugene <br /> ob umber: ~ ~ ' " ' ' Contract Number: " 244 E. Broadway <br /> Eugene, OR 97401 <br /> Offic File Number: Capital Project Number: (541) 687-5560 <br /> FAX: (541) 984-8410 <br /> TTY: (541) 687-5245 <br /> The ndersigned Owner requests the Pau-blic Improvements as described below: <br /> Type of improviement: J ` s~ ~ `~J~ S <br /> (Paving, sanitary sewer, storm sewer, sidewalk, etc.) <br /> I <br /> Location: ' f~'~ ~~516ti-1 <br /> (Street or easement. If a subdivision, print subdivision name) <br /> North or east limit: ~~SS ~G''~'e- South or west limit: ~ONt ~ ~ ~~r <br /> (except for~s~ub-divisions) (except for subdivisions) <br /> be signed and constructed during the ~ or subsequent construction season in the following manner (check one): <br /> (Year) <br /> 1. As a City engineered and constructed project (eligible for assessment financing). <br /> City agrees: , <br /> a} to perform engineering design, cost estimate, award of contract, construction inspection, and assessment <br /> tabulation for the improvements; <br /> b) to participate in the cost of necessary additional capacity of improvements beyond the assessable amounts ~ <br /> as stipulated in the Eugene Municipal Code. <br /> Owner agrees: <br /> a) to pay all engineering and construction costs which are not eligible for assessment financing. <br /> b) it the undersigned owner chooses to discontinue the City engineering and construction process prior to <br /> execution of a construction contract, the owner further agrees to pay alt engineering and other project-related <br /> costs incurred by the City to that point, and to comply with paragraph 2 below, if applicable. <br /> 2. As a privately engineered and constructed project with private financing arranged by the Owner. <br /> Owner agrees: . <br /> a) to install all required public improvements at no cost to the City; <br /> b) to pay actual City costs incurred for plan review and processing, inspection, materials testing, and other <br /> engineering services, all of which will be billed and payable monthly with final payment due prior to City's <br /> final acceptance of the completed improvements. <br /> c) to provide the City a bond, which includes a cne-year warranty period, in an amount sufficient to cover all engineering and <br /> construction costs associated with completion of the required public improvements. <br /> ~ d) to pay other charges and levies for public improvements, 'rf required. Other charges may include, but are not limited to: <br /> t) penalty charges: in the event the property owner fails to make payment when due under this agreement, the property <br /> owner shall be charged a penalty in the amount of 825 or ten percent (10%) of the past due amount, whichever is <br /> greater. Payment of the penalty shall not consitute a waiver by the City of its other remedies. <br /> 2) interest charges: property owner shall pay interest on all past due amounts at the rate of eighteen percent (18%) <br /> j per annum from the due date until paid. This sum shall be in addition to penalty charges. <br /> I <br /> I <br /> ~ PROPERTY OWNER CO.OWNER OF EUGENE <br /> PR P AME CO-0WNER'S NAME SIG TORE <br /> SI NATUR ^ ~ SIGNATURE TITLE <br /> L , ~'Q <br /> D [/E/ DATE DATE <br /> p~pgE~~ ~~y ~ ' ~ © DDRESS 777 PEARL STAEET <br /> 1~ ~ y ~P~> L° ~/i~ i' ',~0~ EUGENE. OREGON 97401 <br /> SCI / STAT /ZIP ~ CITY /STATE /ZIP <br /> PHONE NUMBER (business hours) PHONE NUMBER (business hours) <br /> ENG (x(29) ORIGINAL /CITY YELLOW /OWNER PINK /ENGINEERING AUGUST 1996 <br /> i <br /> <br />