New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4301 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4301 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:11:11 PM
Creation date
7/9/2008 3:17:46 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004301
GL_Project_Number
374301
Identification_Number
Begin Warranty
COE_Contract_Number
2005-00521
Retention_Destruction_Date
7/31/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Notification of Commencement and <br /> Public Works V. <br /> <br /> Completion Dates for Contract Projects Engineering <br /> City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> DrATE CONTRACT NO. <br /> 5!8/2006 2005-521 <br /> PROJECT NAME JOB NO. <br /> Crescent Village Phase 3A Lord Byron Place 4301 <br /> CONTRACTOR FEDERAL AID PROJECT NO. <br /> Kipco, Inc. <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> Olen A. Fee 541-682-5195 <br /> FIRST NOTIFICATION <br /> 6/$/05 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> SECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> ALL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> (9EE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> 5/$/2006 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1, ALL WORK IS GUARANTEED BY THE <br /> CONTRACTOR FOR ONE YEAR FOLLOWING THE DATE OF THE CITY'S NOTICE OF WORK COMPLETION. MANUFACTURE WARRANTIES <br /> REMAtN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED ONE YEAR. <br /> THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT BECOME EVIDENT <br /> WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN THE ONE-YEAR W NTY P~IOD ILL BE <br /> REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE REPAIR. <br /> 7 <br /> Inspector ig ture <br /> For Privately Engineered Projects Only <br /> Engineer. Olson & Morris <br /> Address: 1410 Oak St, Suite 200 <br /> Eugene OR 97401 <br /> Owner: Arlie and Co <br /> Address: 871 Country Club Rd <br /> Eugene OR 97401 <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-1\4301\Correspondence\Contractors\4301 2006-05-08 Third Notification.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.