CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: WILDISH CONSTRUCTION CO. <br />(ADDRESS) P.O BOX 7428 <br />Eugene, OR 87401-0428 <br />PROJECT: Paving, curbs, gutters, sidewalks, median, street lights, traffic signal, <br />street trees, wastewater, and storm water drainage on Garden Way from <br />Sisters View Ave. to Martin Luther King Jr. Bld. north side of Martin Luther <br />King Jr. Bivd. from Marche Chase Drive to 1-5 <br />You are directed to make the following changes in this contract: <br />Contract <br />Contrac <br />Item <br />No. t <br /> <br />1240 Widish rovided a rice credit at Ci re uest for a than a of material after installin a 15 inch PVC in lace of a 15 inch RCCP i <br /> <br />1250 B 'er nd median atteratlon station 33+03 to 33+50 <br /> <br />1280 R lace e~astin ODOT ove ass storm drain i e in new location <br /> <br />1270 40 0 si concrete under stren th rice reduction <br /> <br />1280 In `erta tees et Commons for two added curb inlets <br /> <br />t 290 G Uti wnflids sta 44+00 - 48+00 <br /> <br />1300 Dr ew cut remove and relocate 132 S Garden Wa <br /> <br />changes the bid items as follows: <br />Contract <br />Item <br />No. <br />Item Tlme <br />Chan a Quantity <br />Units Unit <br />Cost <br />Amount <br />+/- Amended <br />Chan a Net <br />Chan e <br />1240 Change of pipe material Orr final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS $568.51 $568.51 568.51 <br />1250 Balrier and median change Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 .00 0.00 <br /> Amended 1.00 LS $4 840.23 4840.23 840.23 <br />1260 0407 ADS overpass storm drain Orr final 0.00 .00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS $3,923.74 3 923.74 3 923.74 <br />1270 4000 PSI concrete price reduction Orf anal 0.00 0.00 .00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS $1129.32 $1129.32 1129.32 <br />1280 Inserts Tees Ori final 0.00 0.00 0.00 $0.00 <br /> RevLsert 0.00 0.00 0.00 <br /> Amended 1.00 $702.01 #702.01 702.01 <br />1290 31, S Garden Way drNeway alteration Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 1765.25 1765.25 1765.25 <br />1300 Dr eway cut remove and relocation Orr anal 0.00 0.00 0.00 $0.00 <br /> 132 S Garden Way Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 652.30 652.30 52.30 <br /> 0 Inal 0.00 .00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 $0.00 <br />The original contract work days are o.o da <br />The contract lime change this C.O o.o da <br />The contract time change by previous C.O.'s o.o as <br />Then contract work da s are o.o da s <br />The original contract sum was <br />Net change by previous change order _..,,.._.~___._ ................___.,~_._-................._..._~_~_. .~ <br />Net change due to amendment by previous change order <br />The contract sum prior to this change order was _ ..~..........._ ,_.,~ ~~~~~~~~~~ <br />This change order will change contract sum by this amount _ ,_,,. <br />The rtsw contract net change sum „_,,,,__,,, ..,__ <br />The now tAnirad amendment sum <br />The newcontract sum inGuding this change order will be _... µµ~-~~'_ ~,,,,-,-,-,,,,~,,,, <br />Percents a of on final contract <br />NET C GE DUE TO AMENDMENTS ~~ _M......_.. ».____.. <br />Appr a by: <br />CI engineer <br />~~~~ l-% <br />_(~ e <br />LJ CONT CTOR <br />RA ^ OFFICE FILE <br />Prime a r <br />Date <br />^ PURCHASING/CRO <br />Job # 3502 <br />Contrect # 2004-20 <br />Change Order # 3 <br />Date: 01/12/05 <br />CAMS Date: <br />Reviewed by: Date: <br />Inspector. John Bonham <br />Constr. Mar. Paige Dickinson / <br />Proi. Mgr. Steve Gallus <br />Principal Eng. Paul Klooe <br />79 45, 0.75 <br />$1,348.00 <br />$20,891.63 <br />52,088,994.38 <br />$10,185.70 <br />tsl,3as.oo) <br />531,077.33 <br />a2,1o9,1eo.oa <br />1.48% <br />1.49% <br />Third Party <br />Date <br />O~FORMSIPROJECT\CONSTtREVISED CHANGE ORDER.XLS <br /> <br />