CITY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />Change Order
<br />COIUTRACTOR: WILDISH CONSTRUCTION CO.
<br />(ADDRESS) P O BOX 7428
<br />Eugene OR 97401-0428
<br />PROJECT: Paving curbs gutters sidewalks median street lights, traffic signal, street
<br />trees wastewater and storm water drainage on Garden Way from Sister View
<br />Ave to Marlin Luther King Jr. Blvd. and the north side of Marlin Luther King.
<br />Jr. Blvd. from Marche Chase Drive to I-5
<br />You are directed to make the following changes in this contract:
<br />Contract
<br />Job # 3`x'02
<br />S: Cntraat # 2004-2G
<br />C:hango Order # '_
<br />Date: 121MGlG4 -
<br />CAMS Data:
<br />RfVIOW3d by: Doty:
<br />inspector: Johr. E3anham
<br />Crsnst Mgr Paiae D':cklnson ..
<br />Proi Mgr Stcvo Gallup
<br />Principal Eng. FauE Klape
<br />Item
<br />No.
<br />11 SO conflicts with existin under round utilities
<br />'I 16G 'Canflfrts 4VIth exiStinQ ilnder railed utilities
<br />117G 'coriflictswith existin under round utilities
<br />1980 'Remove exir>1n, inactlva stone nine and lu inlet at existin manhofs
<br />1190 conflicts vritti nowl• installed EWEB under round utilities
<br />1200 Reniae~e Chzin Eink fence from rc 3 belon in to Simpson Housin , LXD
<br />760 Provire t;redit to C" -for not remove exisEiri woad traf~ic oles befrre insfallin~ new mas! arrn traffic: ales and not re iacin exisfin 1-1!2" conduit
<br />i 210 ravide reinforccmont in concrete surfaces
<br />122G Ins~ali wt~ad fence
<br />1230 Irri ation sliwves
<br />This changes the bid items as follows:
<br />!`nn*r~n4
<br />VVIIl
<br />Item
<br />No. 1 QIN~
<br />
<br />Item ^~••••^-
<br />Time
<br />Chan a
<br />Quantity
<br />Units
<br />Unit
<br />Cost
<br />
<br />Amount
<br />
<br />+l-
<br />Amended
<br />Chan a
<br />Net
<br />Chan e
<br /> Ori final G.00 ~ 0.00 0.00 $0.00
<br />~+'' ' Revised 0.00 1 0.00 0.00
<br />iiSU' ~i a canfirts c 27 Amended L00 ILS 264.45 264.45 264.45
<br /> Ori final 0.00 1 ^O.UU 0.00 $0.00
<br /> Revised U.UU 1 3U.OU 0.00
<br />11601 i conflici~s 4128 Amended 1.00 ;LS 51.391.29 1391.29 1391.29
<br /> Ori final 0.00 ~ $0.00 0.00 $0.00
<br /> Revised 0.001 0.00 0.00
<br />ii7U' t ~e carifi(rts ~/2y Amended 1.00 ;LS $1024.89 1024.89 1024.89
<br /> Ori final 0.00 1 ~O.UU 0.00 $0.00
<br /> Revised 0.00 , 0.00 0.00
<br />1180 Plug and Cem4Ve e.YlStin i e Amended 1.00 IL $248.18 $248.18 248.18
<br /> Ori final G.001 $0.00 0.00 $0.00
<br /> Revised 0.001 0.00 0.00
<br />1190 utili cailfilc+s. sta» laterals sta 11•=~00-18t•00 Amended
<br />Ori final E.00 ILS
<br />0.00 ~ 653.17
<br />U.UO 658.17
<br />0.00 658.17
<br />$0.00
<br /> Revised O.OC i SU.UU 0.00
<br />i 200 RsG.oiave Sim son Hcusin fence
<br />76C Leave ex wood TS poles iri piece Amended
<br />Ori final 1.C~0 ; L5
<br />1.GG 1 $753.05
<br />1~F5 000.00 $753.05
<br />145 000.00 753.05
<br />($1,348.00)
<br />~ Revised 1.G0 ~ 143 652.00 143 652.00
<br />7F Amended C.CC ~ LS SG.vU 0.00 $0.00
<br /> Ori final C.00 1 SC.UU 0.00 $0.00
<br /> Revised U.CC . LUAU 0.00
<br />1.2.10 added bars & daNlei.S t.C C & Q, canc. Inters. Ix tilrnaut Amended 1.GG 1 LS $" 995.29 $2 995.29 $2 995.29
<br /> Ori final O.GG O.OG 0.00 $0.00
<br /> Revised 0.00 i 0.00 0.00
<br />122E TnstaiE wvaad fence Amended
<br />Ori final L00 ILS
<br />U.00 1 S:Es66.2U
<br />SU.UO 1366.20
<br />0.00 1366.20
<br />$0.00
<br /> Revised C.CC ~ $U.UO 0.00
<br />1230 irri, ation sleeves Amended 95.OG ~ E.Tf~ T $3.78 359.51 9.51
<br /> 1 ~
<br />The original contract work days are o.o da s ~a
<br />The contract time change this C.O o.o days /L~
<br />The contracttime change by previous C.O.'s o.o da s
<br />The new contract work da are o.o da s
<br />The original contract sum was
<br />Net change by previous change order .,
<br />Net change due to amendment by previous change order
<br />The contract sum prior to this change order was
<br />This change order will change contract sum by this amount
<br />The new contract net change sum
<br />The new contract amendment sum
<br />$2 079,450. ~ 5
<br />. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
<br />sG.GG
<br />S11,a3G.60
<br />,,....µ-.~.^. ~,..._, v w $2 091 281.35
<br />The new contract sum including this change order will be .................„..,,,,,,,,,,,.,..,,...,.,,,,,,,..,...,...,.............,
<br />Percents a of on final contract
<br />N CHANaE DUE TO AMENDMENTS ..................................................................................................
<br />Appr vai by:
<br />~'
<br />^ky Engineer Prime Contractor
<br />/// 1
<br />Date Da
<br />a _ $134a.oo
<br />...
<br />i ,,.... •-..., ~ $20,891.63
<br />~~ ..,,,. $2 098 994.38
<br />0.94%
<br />~~' ~J~' , s.oo~
<br />~~
<br />Third Party
<br />Date
<br />^ CONTRACTOR ^ OFFICE FILE Q~oRMSwROJECT~~'~EVCFUtivGE ORDERxLS