CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS , <br /> ENGINEERING DIVISION <br /> :hange Order Jon # 3az7 <br /> Contract # 2006.04 <br /> CONTRACTOR: Babb ConsWction Co. dba Delta Const. Co. Change Order # 5 <br /> (ADDRESS) 999 Division Avenue Date: 09!23/05 <br /> Eugene, OR 97404 CAMS Date: <br /> Reviewed by: Date: <br /> PROJECT: Paving, curbs, and gutters, sidewalks, landscape medians, street lights Inspector. Dan Ke le <br /> street trees wastewater and storm water drainage on 3rd and 4th Avenues Construction M r. Pai a Dickinso <br /> between Pearl Stand Lincoln St north of the Southern Pacific Railroad Proj. Mgr. Steve ~allu <br /> I and south of Skinner Butte Park Pdncipal Eng. Paul Kio e <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> <br /> ~ Item <br /> No. <br /> 0890 CONSTRUCT DRAIN LINE FOR DEWATERING STANDING WATERAT 13+50 <br /> <br /> i 0900 REGRADE AND FORM DRNEWAY APPROACH AT STA. 21+00 INCLUDES STANDBY TIME <br /> <br /> i <br /> This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Change (Units) Cost Amount Change Change <br /> 0890 Construct temporary drain line Ort final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> 0 Amended 1.00 LS $1,463.45 $1,463.45 $1463.45 <br /> - 0900 Regrade and form driveway approaches Ori final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00- 0.00 <br /> 0 Amended 1.00 LS $334.33 $334.33 $334.33 <br /> Od final 0.00 0.00 0.00 $O.OD <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 $0.00 $0.00 $0.00 <br /> Orl final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 $0.00 <br /> Or( final 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 $0.00 0.00 $0.00 <br /> Orl anal 0.00 0.00 0.00 $0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 0.00 $D.00 <br /> The original contract work days are o.o da <br /> ThQ contract time change this C.O o.o da <br /> ;ontract time change by previous C.O: s .0 da <br /> ~ new contract work da s are o.o da <br /> The original contract sum was st.oz3,otos3 <br /> ,Net change by previous change order <br /> so.oo <br /> Net change due to amendment by previous change order $ta,229,t9 <br /> The contract sum prior to this change order was $1,037,239.92 <br /> This change order will change contract sum by this amount <br /> $1.797.78 <br /> The new contract net change sum So.oo <br /> The new contract amendment sum $15,026.97 <br /> The new contract sum including this change order will be $1,039,037.60 <br /> Percents a of on final wntract 1.57 io <br /> NET CHANGE DUE TO AMENDMENTS 1.57^/0 <br /> Y Engineer~~~.(~ ~Spws Prime ontractor Third Party <br /> p <br /> V (D~S~~ <br /> ~ ~-Z~~ <br /> Date Date Date <br /> ? CONTRACTOR ? OFFICE FILE ? PURCHASING/CRO <br /> Q\FORMS\PROJECTICONST\REVISED CHANGE ORDER.XLS <br /> <br />