~ ~pCJ'~ 1Cb dCo'? <br /> CITY OF EUGENE <br /> DEPARTMENT OF PUBLIC WORKS <br /> ENGINEERING DIVISION <br /> Change Order Job # aoae <br /> Contract # 2007-04 <br /> CONTRACTOR: 2G Inc. dba 2G Construction Change Order # 1 <br /> <br /> Ik (ADDRESS) 1719 Irving Road Date: 10/23/06 <br /> ~r Eugene, OR 97440 CAMS Date: <br /> Reviewed by: Oats: <br /> ' PROJECT: Candlelight Perk Improvements at the inlereectlon of Royal Avenue Inspector: A. Steffen <br /> ' and Throne Drive <br /> Proj. Mgr. S. Milovich <br /> Principal Eng. M. Cahill <br /> You are directed to make the following changes in this contract: <br /> Contract <br /> I IHm <br /> ^i No. <br /> I <br /> 10 Add mobilization era reement. <br /> 380 Moth Irti etlon s tam ab directed. Adds are zone wire and additional heads end relocate controller. <br /> 480 Remove fence osta alread laced. Fill holes end re recta. Provide oats to Clt for store e. <br /> 490 Modi Irti aton s tam to accommodate than a to fencin end Iantin related to do ark. <br /> 500 Construct revel eth around fence in off leash d area. <br /> 510 Add tom oat to resaln to rock areas followln lawn aeadin . <br /> Chan a contract tom IeNon date to November 15 2006 <br /> O This changes the bid items as follows: <br /> Contract Contract <br /> Item Time Quantity Unit Amended Net <br /> No. Item Chan a (Units Cost Amount Chan a Chan e <br /> Add mobilization Ori Inal 1.00 l5 92 546.65 92 546.65 §1,966.10 <br /> Revised 1.00 LS 94 512.75 94 512.75 <br /> I Amended 0.00 0.00 0.00 ;0.00 <br /> Modify Irrigation system Orl Inal 1.00 LS 80 947.00 80 947.00 ;6,452.96 <br /> 2_I Revised 1.00 LS 87 399.96 87 399.96 <br /> ~.7u+ Amended 0.00 0.00 0.00 j0.00 <br /> Remove fence posts Orl Inal 0.00 0.00 0.00 ;0.00 <br /> ~4~ Revised 0.00 0.00 0.00 <br /> Amended 1.00 l5 ;6 534.58 ;6 534.58 ;6 534.58 <br /> Modify Irrigation system for changes Orl anal 0.00 0.00 0.00 §0.00 <br /> ~yt to off leash dog area Revised 0.00 0.00 0.00 <br /> _ ` Amended 1.00 LS 6 561.49 6 561.49 6 561.49 <br /> Construct gravel path Orl Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS ;11765.07 §11765.07 11765.07 <br /> 0 Add compost topdressing Orl Inal 0.00 0.00 0.00 50.00 <br /> ~a0 Revised 0.00 0,00 0.00 <br /> Amended 1.00 LS 8 363.24 8 363.24 ;8 363.24 <br /> The original contract work days are 0.0 de <br /> The contract time change this C.O o.o de e <br /> The contract time change by previous C.O.'s o.o da e <br /> The new contract work da s are o.o da <br /> The original contract sum was <br /> s7ae.»sse <br /> Net change by previous change order <br /> . o <br /> Net change due to amendment by previous change order_.................. <br /> §0.00 <br /> The contract sum prior to this change order was <br /> s7ae.775.sa <br /> This change order will change contract sum by this amount Sa1,sa3.aa <br /> The new contract net change sum <br /> E8.419.08 <br /> The new contract amendment sum 533,224.38 <br /> The new contract sum including this change order will be 57so,a2o.42 <br /> Percents a of on final contract 5.584% <br /> N ANG U EN MEN 5 <br /> Appro I by: <br /> Ciry Engineer 7- Prime Contractor ,Third Party <br /> ~I~b <br /> Date Date Date <br /> CONTRACTOR D OFFICE FILE ~ PURCHASING/CRO <br /> O\FORMS\PROJECT\CONST\REVISED CHANGE ORDER.XLS <br /> <br />