New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4111 Begin Warranty
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4111 Begin Warranty
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:29:20 PM
Creation date
6/27/2008 9:38:12 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Warranty
PW_Active
No
External_View
No
GJN
004111
GL_Project_Number
945674
Identification_Number
Begin Warranty
COE_Contract_Number
2006-00005
Retention_Destruction_Date
2/27/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N©tification of Commencement and Public Works <br /> <br /> Completion Dates for Contract Projects Engineering <br /> - City of Eugene <br /> 244 E. Broadway <br /> Eugene, OR 97401 <br /> (541) 682-5560 <br /> GATE CONTRACT NO. <br /> 9/13/2005 2006-005 <br /> PROJECT NAME JOB NO. <br /> pEBRICK RD.\BUTTE LN. IMPROVEMENTS 4111 <br /> CONTRACTOR FEDERAL AID PROJECT N0. <br /> pELTA CONSTRUCTION <br /> INSPECTOR PHONE NUMBER DATE OF AWARD <br /> SHAWN SPAHT 541-682-5509 7/25/05 <br /> FIRST NOTIFICATION <br /> 09/13/2005 IS THE DATE ON WHICH THE CONTRACT WORK BEGAN. Inspector Signature <br /> $ECOND NOTIFICATION <br /> SPECIFIED COMPLETION DATE (S) (FROM SECT. 00180.50) DAYS CHARGED DATE (S) THE WORK WAS SUBSTANTIALLY <br /> BEYOND SPECIFIED COMPLETED & THE TIME CHARGES STOPPED. <br /> COMPLETION <br /> FILL CLAIMS FOR ADDITIONAL COMPENSATION MUST BE SUBMITTED BY: <br /> SEE SUBSECTION 00199.30 OF THE CONTRACT PROVISIONS FOR ADDITIONAL REQUIREMENTS.) <br /> Inspector Signature <br /> THIRD NOTIFICATION <br /> Notice of Completion. Begin Warranty Period. <br /> t~etxuary 14, 2006 IS THE DATE ON WHICH ALL CONTRACT WORK WAS COMPLETED, INCLUDING CORRECTIVE WORK, EQUIPMENT AND <br /> PLANT REMOVAL, SITE CLEANUP, AND PROJECT MANAGER'S RECEIPT OF ALL CERTIFICATIONS, BILLS AND OTHER DOCUMENTS <br /> REQUIRED UNDER THE CONTRACT. THIRD NOTIFICATION INITIATES THE START OF THE ONE YEAR WARRANTY PERIOD. <br /> IN ACCORDANCE WITH SECTION 00170 OF THE STANDARD SPECIFICATIONS AND CITY AMENDMENT #1 AND #2, ALL WORK IS GUARANTEED <br /> BY THE CONTRACTOR FOR ONE YEAR FOLLOW ING THE DATE OF THE CITY'S NOTICE OF WORK COMPLET?ON. MANUFACTURE <br /> WARRANTIES R~MPJN IN EFFECT FOR THE DURATION OF THE EXPRESSED LENGTH OF THE WARRANTY IF GREATER THAN THE REQUIRED <br /> ONE YEAR. THE~NTRACTOR IS RESPONSIBLE FOR REPAIRS OR REPLACEMENTS MADE NECESSARY BY DEFECTS IN WORK THAT <br /> BECOME EVIDE WITHIN THE ONE-YEAR WARRANTY PERIOD. REPAIRS OR REPLACEMENTS MADE WITHIN T ONE-YEAR WARRANTY <br /> PERIOD WILL BE REQUIRED TO BE GUARANTEED FOR ONE YEAR FROM DATE OF ACCEPTANCE OF THE R I . <br /> Inspector tune <br /> For Privately Engineered Projects Only <br /> Engineer: <br /> Address: <br /> Owner: <br /> .Address: <br /> DISTRIBUTION FOR FIRST, SECOND, AND THIRD NOTIFICATION: <br /> Contractor Engineer Owner Construction Manager File <br /> ADDITIONAL DISTRIBUTION FOR THIRD NOTIFICATION: <br /> Maintenance-Planning Surety PW Administration PIC Engineering PWE As Construct Monitor MADD Supervisor Inspector <br /> Q:\PROJECTS\PROJ-1W111\Construction\Inspection\Third Notification 2-14-06.doc APRIL 2004 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.